Thread Content
On August 29, information released by the Online Approval and Supervision Platform for Investment Projects in Shanxi Province indicated that the pre-review for the approval application of the hydrogen production project via water electrolysis in the New Materials Industrial Park of Lüliang Economic and Technological Development Zone had been approved. The information shows that the total investment for the project is 400,000,000 yuan, with the project starting in December 2025 and ending in December 2027. Construction scale and scope: The net land area for this project is approximately 43,803.95㎡, equivalent to about 66 mu, with a total construction area of 8,748㎡. Construct a production facility covering 3,072 m², along with facilities for temporary storage of hazardous waste, a parts warehouse, an energy storage area, a power substation, a central control room, a laboratory building, an air compression nitrogen generation station, and a refrigeration station. Purchase 5 sets of 1,000 Nm³ ALK electrolyzers and 5 sets of 400 Nm³ AEM electrolyzers. Upon completion, this project will be able to produce 3,400 tons of hydrogen per year.
【History of Haichuan Chemical】The crude oil pretreatment and catalytic cracking units at Yangzhou Petrochemical, which had been in operation for 32 years, were officially shut down and dismantled https://bbs.hcbbs.com/thread-5700372-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, the technology for producing high-oxygen-resistant enamel steel will reach international leading levels. https://bbs.hcbbs.com/thread-5700345-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2647-2025: Zhejiang Zhongkong’s world’s first large-scale temporal model for the process industry is now available for use. https://bbs.hcbbs.com/thread-5700490-1-1.html (Source: Haichuan Chemical Industry Forum)
【HaiChuan Equipment Guessing Game】It looks like a large steel stamp; those who guess correctly will receive rewards. https://bbs.hcbbs.com/thread-5700561-1-1.html (Source: HaiChuan Chemical Forum)
【HaiChuan Equipment Guessing Game】It looks like a large steel stamp; those who guess correctly will receive rewards. https://bbs.hcbbs.com/thread-5700561-1-1.html (Source: HaiChuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2653–2025: Completion of the First Pipeline Laying in China’s Largest Middle East Pipeline Project to Date https://bbs.hcbbs.com/thread-5700633-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in China’s low-temperature coal carbonization technology from 2016 to 2025 https://bbs.hcbbs.com/thread-5700695-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】Self-developed from 2657 to 2025! CNPC’s 100-kilowatt-class large-temperature-difference transcritical carbon dioxide air-source heat pump units put into operation https://bbs.hcbbs.com/thread-5700807-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2658-2025: China’s first adsorption tower circulating oil pump was successfully tested at Jiujiang Petrochemical https://bbs.hcbbs.com/thread-5700823-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Great Development in Chemical Engineering Equipment】The 2659-2025 project on \"Research and Development of Key Technologies for Hydrogen-Blended Natural Gas (HCNG) Internal Combustion Engines and Their Demonstration Applications\" has completed its evaluation process. https://bbs.hcbbs.com/thread-5700860-1-1.html (Source: Haichuan Chemical Engineering Forum)