Thread Content
On September 4, a tender announcement was issued for the construction of the integrated hydrogen energy mining complex project in the mining area of Daye City, which includes the production of green electricity and hydrogen, as well as their storage, distribution, and utilization (Phase II of the hydrogen production plant). According to the tender announcement, the Daye City Mining Area Integrated Hydrogen Project for the Production, Storage, and Utilization of Green Electricity and Green Hydrogen (Phase 2 of the hydrogen production plant) is located in Daye City, Hubei Province. The project covers an area of approximately 79,120 square meters; it involves the construction of a new hydrogen production plant, new factory buildings and related facilities, as well as the acquisition of storage equipment, electrolyzers, and other equipment (with no use of equipment that is explicitly prohibited or phased out). Scope of the tender: Construction of three new green hydrogen production plants, with a total capacity of 300 MW for photovoltaic power stations; establishment of hydrogen refueling stations; development of a municipal smart management platform for the hydrogen industry as well as a digital governance system for urban hydrogen use; and utilization of power and transportation equipment along with the construction of related supporting facilities. Planned duration: 300 calendar days, planned start date: October 11, 2025. Estimated contract price: 350 million yuan. Joint bids are accepted for this tender. The evaluation method for this tender adopts separation of assessment and scoring.
【Ten Years of Rapid Development in Chemical Equipment】Self-developed from 2657 to 2025! CNPC’s 100-kilowatt-class large-temperature-difference transcritical carbon dioxide air-source heat pump units put into operation https://bbs.hcbbs.com/thread-5700807-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2658-2025: China’s first adsorption tower circulating oil pump was successfully tested at Jiujiang Petrochemical https://bbs.hcbbs.com/thread-5700823-1-1.html (Source: Haichuan Chemical Industry Forum)
【Frontiers of HaiChuan Chemical Technology】Amazing! The Dalian Institute of Chemical Physics has made significant progress in the field of photocatalytic hydrogen isomerization, achieving hydrogen isomerization at room temperature. https://bbs.hcbbs.com/thread-5700909-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】China Petrochemical’s first fully domestically produced Safety Instrumented System (SIS) was successfully tested and approved in Hangzhou from 2661 to 2025. https://bbs.hcbbs.com/thread-5700967-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs have been achieved in the pre-oxidation technology for the carbon fiber industry between 2026 and 2025; China’s first pilot-scale pre-oxidation furnace utilizing a combination of hot air and microwave technologies with a width of 0.4 meters has been developed. https://bbs.hcbbs.com/thread-5701002-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2666–2025: Ending a 30-Year Foreign Monopoly! Shin-Nakano’s 180,000-ton liquid methionine project is now in operation! https://bbs.hcbbs.com/thread-5701089-1-1.html (Source: Haichuan Chemical Industry Forum)
【History of Haichuan Chemical】Permanent shutdown of the facilities at Huayi Group’s Shanghai Nenghua Wujing plant https://bbs.hcbbs.com/thread-5701106-1-1.html (Source: Haichuan Chemical Forum)
【History of Haichuan Chemical】Permanent shutdown of the facilities at Huayi Group’s Shanghai Nenghua Wujing plant https://bbs.hcbbs.com/thread-5701106-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2668-2025: China’s first mobile energy storage power system was successfully applied on a drilling platform operated by Great Wall Drilling https://bbs.hcbbs.com/thread-5701137-1-1.html (Source: Haichuan Chemical Industry Forum)
【History of Haichuan Chemical】The crude oil pretreatment and catalytic cracking units at Yangzhou Petrochemical, which had been in operation for 32 years, were officially shut down and dismantled https://bbs.hcbbs.com/thread-5700372-1-1.html (Source: Haichuan Chemical Forum)