HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Filing for the energy-related component of the Inner Mongolia HuanDian Zhenglan Banner integrated wind and solar hydrogen production project (hydrogen production section)

2025-09-23View Original

Thread Content

On September 22, information available on the Online Approval Service Hall for Investment Projects in Inner Mongolia Autonomous Region showed that the application submitted by Huadian (Zhenglan Banner) New Energy Co., Ltd. for the energy-related registration of the integrated wind and solar hydrogen production project in Zhenglan Banner, Inner Mongolia (the hydrogen production portion) was approved for registration. Construction location: Xilin Gol League – Zhenglan Banner – Xilin Gol League-Zhenglan Banner-Maya Mountain Industrial Park. Total investment: 379.629 million yuan, of which self-funded capital amounts to 113.8887 million yuan, bank loans applied for amount to 265.7403 million yuan, and there is no other funding source. Planned construction period: from December 2025 to June 2027. Scale and scope of the project: The hydrogen production facility covered by this project will occupy an area of approximately 500 mu, with a building area of around 3,000 square meters. It will include a comprehensive building for the hydrogen production facility, hydrogen production workshops, and auxiliary production buildings. The investment in this part of the project is estimated at 68 million yuan. The hydrogen production unit is planned to have an annual production capacity of 10,720 tons of hydrogen (with a hydrogen production capacity of 24,000 Nm³/h), and 5 spherical storage tanks with a capacity of 2,000 cubic meters each will be used for storing hydrogen, resulting in a total hydrogen storage capacity of 110,000 cubic meters. In addition to hydrogen storage, an electrochemical energy storage system with a capacity of 45,000 kilowatts/90,000 kWh will also be built. The project includes a set of hydrogen liquefaction equipment.
Reply #22025-09-23
【HaiChuan Safety Discussion】What are the useful applications of AI robots in chemical plants that deserve development? https://bbs.hcbbs.com/thread-5701773-1-1.html (Source: HaiChuan Chemical Forum)
Reply #32025-09-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in the research and development of liquid hydrogen production equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-09-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in the research and development of liquid hydrogen production equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-09-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】World-leading transformative technology for dehydration through coupled reactions of solid materials, 2698–2025 https://bbs.hcbbs.com/thread-5701768-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #62025-09-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】The project under the key research and development program 2699-2025, titled “Research on Key Equipment for the Production, Storage, Transportation, and Refueling of Liquid Hydrogen sowie Related Safety Aspects,” has successfully passed the comprehensive performance evaluation. https://bbs.hcbbs.com/thread-5701769-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-09-27
【Haichuan Teahouse】You are welcome to join! ! ! The leisure section for National Day and Mid-Autumn Festival keeps costing money! ! ! ! https://bbs.hcbbs.com/thread-5702022-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-09-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2705-2025 Research and Demonstration Project on Key Technologies for Large-Scale Advanced Power Storage – the 50 megawatt/100 megawatt-hour digital storage demonstration project – has passed the acceptance review. https://bbs.hcbbs.com/thread-5701879-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-09-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, the total length of offshore oil and gas pipelines in China will exceed 10,000 kilometers. https://bbs.hcbbs.com/thread-5702037-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-09-28
【Haichuan Explores the World】What is a sand battery? https://bbs.hcbbs.com/thread-5702064-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.