HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Quzhou Dacai New Energy Materials (Zhejiang) Co., Ltd. invested 688 million yuan in a project for new solid-state battery functional additive materials

2025-09-25View Original

Thread Content

Project Name: Dacai New Energy Materials (Zhejiang) Co., Ltd. Solid-State Battery Functional Additive New Material Project
Launch Date: September 25, 2025
Location: Zhejiang
Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Specialty Chemical Products
Project Owner: Dacai New Energy Materials (Zhejiang) Co., Ltd.
Total Investment: 688.43 million yuan
Current Progress: Land use approval obtained
Construction Location: Plot E-9-3#, east of Jugao Road and north of Yansheng Road, High-Tech Zone of Zhizao New City, Quzhou City, Zhejiang Province
Construction Scope: The project will be implemented in two phases. In the first phase, 60 mu of new land will be acquired for the construction of Class A production workshops and Class A warehouses, enabling the production of 37,100 tons of functional materials for solid-state batteries (15,000 tons of acrylic and ester-based functionalized water-based adhesives, 600 tons of powdered functionalized modified composite nanocellulose dispersants, 15,000 tons of liquid functionalized modified composite nanocellulose dispersants, 2,500 tons of styrene-acrylic emulsion-based water-based adhesives, 1,500 tons of new type of composite functionalized styrene-butadiene emulsions, 1,000 tons of oil-based functional integrated conductive adhesives, and 1,500 tons of water-based functional integrated conductive adhesives). In the second phase, 39.98 mu of new land will be acquired for the construction of Class A production workshops and Class A warehouses, enabling the production of 37,100 tons of functional materials for solid-state batteries (15,000 tons of functionalized acrylic and ester-based water-based adhesives, 600 tons of powdered functionalized modified composite nanocellulose dispersants, 15,000 tons of liquid functionalized modified composite nanocellulose dispersants, 2,500 tons of styrene-acrylic emulsion-based water-based adhesives, 1,500 tons of new types of functionalized styrene-butadiene emulsions, 1,000 tons of oil-based functional integrated conductive adhesives, and 1,500 tons of water-based functional integrated conductive adhesives). Progress milestone: On 2025-09-24, the planning permit for construction land was obtained. (Land use permit)
Reply #22025-09-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, China will have independently developed 175,000 cubic meter large-scale LNG transport ships – delivery completed https://bbs.hcbbs.com/thread-5701843-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-09-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】2702-2025: Aerospace Changzheng’s self-developed \"Integrated Gas Flow Bed High-Efficiency Conversion Technology for the Carbonization, Grinding, and Gasification of Aerospace Biomass\" released https://bbs.hcbbs.com/thread-5701844-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #42025-09-27
【Haichuan Teahouse】You’re welcome to join! ! ! The leisure section for National Day and Mid-Autumn Festival keeps costing money! ! ! ! https://bbs.hcbbs.com/thread-5702022-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-09-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 2000V photovoltaic demonstration facility was inaugurated in Wenchang, Hainan, between 2026 and 2025; the Datang Hainan 2000V demonstration project was launched at the same time. https://bbs.hcbbs.com/thread-5701880-1-1.html (Source: Hainan Chemical Industry Forum)
Reply #62025-09-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s largest diameter forging and rolling equipment cluster put into operation in Jinan from 2027 to 2025 https://bbs.hcbbs.com/thread-5701911-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-09-30
【Ten Years of Rapid Development in Chemical Processing Equipment】World’s largest 5,000-square-meter \"air capture umbrella\" was shipped to Inner Mongolia for testing, 2711–2025 https://bbs.hcbbs.com/thread-5702018-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-09-30
【Haichuan National Day Spending Bonus Reward Wealth】The twin festivals have arrived; have you set out today?» https://bbs.hcbbs.com/thread-5702164-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-10-03
【Ten Years of Rapid Development in Chemical Engineering Equipment】The largest domestic sulfur-containing natural gas purification plant, with a processing capacity per unit of 2716–2025, was put into operation in Anyue, Sichuan. https://bbs.hcbbs.com/thread-5702301-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.