HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Tender for EPC general contracting of the purification unit for the 2 billion cubic meters per year coal-to-natural gas project at Western Energy Zhundong!

2025-09-27View Original

Thread Content

Tender for EPC general contracting of the purification unit for the 2 billion cubic meters per year coal-to-natural gas project at Western Energy Zhundong! Chapter 1 Public Tendering 1. Tendering Conditions The name of this tender project is: Public Tender for the EPC General Contracting of the Purification Unit for the Western Energy Zhundong 2 billion cubic meters per year coal-to-natural gas project. The project’s tendering number is CEZB250108962. The tendering party is Guoneng Xinjiang Coal-to-Gas Co., Ltd., and the project owner is also Guoneng Xinjiang Coal-to-Gas Co., Ltd. The funding for this project comes from internal sources. The tendering agency is **Energy Group International Engineering Consulting Co., Ltd.** This project meets the requirements for bidding, and public bidding for domestic qualification review is now being conducted for it. 2. Project Overview and Scope of Bidding 2.1 Project Overview, Scope of Bidding, and Division into Bids/Contracts: Project Overview: In order to achieve the local conversion of coal resources in Xinjiang, establish a modern industrial system, and promote the development of integrated industries related to coal-to-oil, coal-to-gas, and clean energy, it is planned to build the **Energy Group Zhundong 2 billion cubic meters per year coal-to-natural gas project in the Zhundong Economic and Technological Development Zone of Xinjiang, taking advantage of the region’s abundant coal resources. The factory is located in the Xiheshan Industrial Park of the Zhundong Economic and Technological Development Zone in Xinjiang, about 300 kilometers away from Urumqi. The project covers an area of 224 hectares and has a rectangular shape, with a length of 2000 meters from east to west and a width of 1120 meters from north to south. The project is located about 2 kilometers south of Hengsi Road in the Xihei Mountain mining area, and is adjacent to Xinyou Power Plant and Inga Power Plant on its southern side. The main components of the project include: air separation units, gasification units (fixed-bed gasification, gas-water separation, ammonia and phenol recovery, shift reaction and cooling), purification units (acid gas removal, refrigeration and compression, RTO, carbon capture), methanation units (high-temperature methanation, natural gas compression and drying), sulfur recovery units, power generation and new energy systems, as well as boiler systems, utility facilities, and auxiliary production equipment to support the process units. Scope of the tender: The bidder is responsible for the design, procurement, and construction of all processes, static equipment, dynamic equipment, layout planning, pipelines, instrumentation and automation systems, electrical systems, telecommunications, civil engineering (structure/construction), HVAC systems, fire protection measures, analysis and testing facilities, water supply and drainage systems, safety measures, environmental protection measures, as well as occupational health and safety aspects within the scope of the purification plant. Construction shall be carried out in accordance with the requirements of “6+2” principles. The bidder is also responsible for all tasks related to individual unit tests, mechanical completion, intermediate handovers, delivery acceptance, special inspections, and final acceptance. Additionally, the bidder shall provide technical guidance and support services during the stages of integrated testing, trial operation with feedstock, actual operation, and performance evaluation.
Reply #22025-09-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, the total length of offshore oil and gas pipelines in China will exceed 10,000 kilometers. https://bbs.hcbbs.com/thread-5702037-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32025-09-28
【Haichuan Explores the World】What is a sand battery? https://bbs.hcbbs.com/thread-5702064-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-09-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 2000V photovoltaic demonstration facility was inaugurated in Wenchang, Hainan, between 2026 and 2025; the Datang Hainan 2000V demonstration project was launched at the same time. https://bbs.hcbbs.com/thread-5701880-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-09-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The heavy oil catalytic cracking (RTC) technology developed independently by the Shih Chien Institute from 2008 to 2025 converts low-quality heavy oil, which has a large volume but high costs, into light olefins. https://bbs.hcbbs.com/thread-5701894-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-09-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s largest diameter forging and rolling equipment cluster put into operation in Jinan from 2027 to 2025 https://bbs.hcbbs.com/thread-5701911-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-09-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2692-2025: China’s first demonstration project for using microorganisms to convert carbon dioxide into feed protein has achieved successful pilot production https://bbs.hcbbs.com/thread-5701661-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-09-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】International Leadership in Revolutionary Technologies for Dehydration through Coupled Reactions of Solid Materials 2698-2025 https://bbs.hcbbs.com/thread-5701768-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #92025-09-30
【Ten Years of Rapid Development in Chemical Equipment】100% domestic production of key equipment from 2027 to 2025! The world’s largest coal-fired power plant carbon capture demonstration project has been put into operation at Huaneng Zhengning Power Plant in Gansu, China. https://bbs.hcbbs.com/thread-5701920-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-09-30
【Haichuan National Day Spending Bonus Reward Wealth】The two festivals are here – have you set off today?» https://bbs.hcbbs.com/thread-5702164-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-09-30
【Ten Years of Rapid Development in Chemical Processing Equipment】World’s largest 5,000-square-meter \"air capture umbrella\" sent to Inner Mongolia for testing, 2711–2025 https://bbs.hcbbs.com/thread-5702018-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.