HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Haichuan Overseas Engineering] GCL Group deepens cooperation with Ethiopia to build a $2.5 billion refinery

2025-10-10View Original

Thread Content

This post was last edited by HaiChuanLaoYu on 2025-10-22 at 21:40. According to foreign media reports, Golden Concord Group signed an agreement with Ethiopia earlier this month to build an oil refinery worth $2.5 billion in the country’s Somali Region, in order to help Ethiopia reduce its oil imports and promote industrial development. The refinery will be developed jointly by GCL Group and the sovereign wealth fund Ethiopian Investment Holdings (EIH). The project is called the Gode project; in addition to the refinery, it also includes a fertilizer plant built jointly by the state-owned Ethiopian Investment Holding Company and Nigeria’s Dangote Group. Ethiopia’s Prime Minister Abiy Ahmed Ali recently launched the Gold Project, laying the foundation for an oil refinery and a fertilizer plant. The refinery is expected to process around 3.5 million tons of fuel per year, which is approximately 70,000 barrels per day (bpd). The project’s commissioning date has not yet been announced, but according to the prime minister’s spokesperson, the first of the two construction phases should be completed within 24 months. The facility will use crude oil and condensate from the Hilala oil field in the Somali Region of eastern Ethiopia. At the beginning of this month, GCL Group’s 200,000 cubic meter modular LNG plant in Ethiopia began operations, while large-scale projects such as the second phase of the LNG liquefaction modular facility and natural gas power generation also started construction at that time. According to foreign media reports, Ethiopian Finance Minister Ahmed Shide and Zhu Gongshan, chairman of GCL Group, discussed accelerating the development of refineries, metallurgical centers, as well as oil and gas projects. Give praise and encouragement to the achievements made in China’s chemical engineering technology and equipment; your participation in discussions is the greatest encouragement**********************【Ten Years of Great Development in Chemical Engineering Equipment】Ongoing updates and summaries available – feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html *****************
Reply #22025-10-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2723-2025: Dongfang Boiler pioneers boiler-unit integration technology to unlock new possibilities for lignite utilization https://bbs.hcbbs.com/thread-5702453-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32025-10-10
【Haichuan’s Grand Spending for National Day】Good news. There are only 132 days left until the next major holiday, Spring Festival. https://bbs.hcbbs.com/thread-5702665-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-10-10
【Haichuan’s Grand Spending on National Day】On the first day back to work after the long holiday, full of energy! https://bbs.hcbbs.com/thread-5702678-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-10-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2724-2025 Fuzhou City base, the first national **-level research, testing, and demonstration facility for offshore wind power, is expected to become operational this year. https://bbs.hcbbs.com/thread-5702507-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-10-11
【Ten Years of Great Development in Chemical Engineering Equipment】2025–2035: From Black Shackles to Green Building Materials – A Transformation of Coal-Based Solid Waste https://bbs.hcbbs.com/thread-5702535-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-10-12
【Ten Years of Rapid Development in Chemical Processing Equipment】From Reliance on Imports to Global Leadership: 6 Years of Efforts to Develop Helium, the \"Blood of Industry\", 2726–2025 https://bbs.hcbbs.com/thread-5702633-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-10-12
【Ten Years of Rapid Development in Chemical Processing Equipment】From Reliance on Imports to Global Leadership: 6 Years of Efforts to Develop Helium, the \"Blood of Industry\", 2726–2025 https://bbs.hcbbs.com/thread-5702633-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-10-12
【Ten Years of Rapid Development in Chemical Equipment】2727–2025: High pressure to reach 10 MPa! Zhongneng Dayou has successfully developed a multi-field coupling testing device for hydrogen production using 100kW-class PEM electrolyzers. https://bbs.hcbbs.com/thread-5702702-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-10-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, CNPC Pipeline Bureau successfully developed an intelligent anti-corrosion construction robot for storage tank exteriors. https://bbs.hcbbs.com/thread-5702707-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.