Thread Content
Public Announcement on Guodu Chemical’s Project to Produce 80,000 tons of polyether polyols and 40,000 tons of polymer polyols per year – 2025-10-30 15:00:37. Recently, the Zhenhai Branch of the Ningbo Natural Resources and Planning Bureau issued a public announcement regarding Guodu Chemical (Ningbo) Co., Ltd.’s project to upgrade its production lines for manufacturing 80,000 tons of polyether polyols and 40,000 tons of polymer polyols per year, as well as to adjust its production line for epoxy resins to an output of 32,000 tons per year. Project Name: Technical renovation of the production line for 80,000 tons of polyether polyols and 40,000 tons of polymer polyols per year, along with the construction of a production line for 32,000 tons of epoxy resins.
Construction Unit: Guodu Chemical (Ningbo) Co., Ltd.
Construction Location: No. 169, Haixiang Road, Ningbo Petrochemical Economic and Technological Development Zone.
It is understood that this project is located within the Guodu Chemical (Ningbo) factory complex in Ningbo City, Zhejiang Province. The land area used for this project is 69,800 square meters, while the area occupied by buildings, structures, and equipment is 24,817.45 square meters. The total investment amount has not been disclosed. Plans include increasing production capacity by 80,000 tons of polyether polyol and 40,000 tons of polymer polyol through technical upgrades and expansions, as well as building a new epoxy resin production line with a capacity of 32,000 tons. The construction work mainly involves the renovation and construction of units such as the direct method unit, salt plant, raw material tank area, production area tank area, epoxy circulating water station, auxiliary buildings, reuse tanks, and operation rooms.
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, Sinochem Advanced Fibers’ technology for producing para-aramid fibers will reach international advanced levels. https://bbs.hcbbs.com/thread-5704132-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2789-2025: China’s First Integrated Marine Hydrogen, Ammonia, and Alcohol Project Produces Green Methanol https://bbs.hcbbs.com/thread-5704114-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2788-2025: Breaking Free from Import Dependence! 140,000 tons per year production facility for ultra-high purity high molecular weight polyethylene launched in Shanghai! https://bbs.hcbbs.com/thread-5704112-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2788-2025: Breaking Free from Import Dependence! 140,000 tons per year production facility for ultra-high purity high molecular weight polyethylene launched in Shanghai! https://bbs.hcbbs.com/thread-5704112-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2788-2025: Breaking Free from Import Dependence! 140,000 tons per year production facility for ultra-high purity high molecular weight polyethylene launched in Shanghai! https://bbs.hcbbs.com/thread-5704112-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2786-2025: China’s First Pilot Plant for Low-Energy, Ultra-Low Pressure Pressure Swing Adsorption Carbon Capture https://bbs.hcbbs.com/thread-5704038-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2785-2025: Pilot-scale demonstration completed for the calcium-cycle thermochemical energy storage system coupled with carbon capture at Huaneng Xi’an Thermal Power Institute https://bbs.hcbbs.com/thread-5704037-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2784 to 2025: The Institute of Metal Research, Chinese Academy of Sciences achieves ton-scale industrial production of high-purity C276 alloy https://bbs.hcbbs.com/thread-5703977-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2783-2025: Ningbo Juhua’s world’s largest integrated PDO/PTT plant comes online https://bbs.hcbbs.com/thread-5703945-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2774-2025: SINOPEC Heavy Equipment and ERIC Group develop the world’s largest mixed-type pumped storage hydroelectric turbine ball valve cast steel components https://bbs.hcbbs.com/thread-5703688-1-1.html (Source: Haichuan Chemical Industry Forum)