Filing for the project to produce 130,000 tons of green hydrogen per year, submitted by Inner Mongolia Yingjie Chunhydro Energy Technology Co., Ltd

2025-11-04View Original

Thread Content

On October 30, information from the Online Approval Service Hall for Investment Projects in Inner Mongolia Autonomous Region indicated that the project proposed by Inner Mongolia Yingjie Alcohol-Hydrogen Energy Technology Co., Ltd., aimed at producing 130,000 tons of green hydrogen per year, had been approved for registration. Project location: Xingan League – Zhalaitai Banner, Xingan League, Inner Mongolia. Total investment: 530 million yuan, of which 159 million yuan comes from own funds; 371 million yuan is to be borrowed from banks, with 0 yuan coming from other sources. Planned construction period: from February 2026 to December 2027. Scale and scope of the project: The facility for the utilization of green energy and hydrogen production – a plant capable of producing 130,000 tons of green hydrogen per year. The project adopts a mature technology pathway for hydrogen production via alkaline electrolysis of water, and includes corresponding equipment such as rectifier transformers, electrolyzers, and gas-liquid separation and purification units. Infrastructure and utility systems include newly built hydrogen production facilities, compression stations (if necessary), hydrogen storage facilities, a comprehensive office building, substation facilities, and a water supply system.
Reply #22025-11-04
【Ten Years of Rapid Development in Chemical Engineering Equipment】2794–2025: Chinese scientists overcome the high-carbon-emission challenge in F-T synthesis, giving this century-old process a low-carbon future https://bbs.hcbbs.com/thread-5704322-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-04
【Ten Years of Rapid Development in Chemical Processing Equipment】2795–2025: Filling a Gap in China’s Market – Boyun Bio’s High-Performance Chromatography Consumables Facility Now Operational in Tianjin https://bbs.hcbbs.com/thread-5704377-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-05
【Ten Years of Rapid Development in Chemical Processing Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-05
【Ten Years of Rapid Development in Chemical Processing Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-05
【HaiChuan Discussion】The client’s demands are getting higher and higher, while the prices kept being pressed lower. Can such work still pass the acceptance test? https://bbs.hcbbs.com/thread-5704576-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The first commercial ammonia-to-hydrogen production facility in China with a capacity of 1,000 kilograms was officially commissioned in Foshan between 2027 and 2025 – the Fuda Zijin facility. https://bbs.hcbbs.com/thread-5704478-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The core equipment for China’s first 400,000 tons/year LAO production facility – the high-purity C4 and C6 product towers – was inspected and accepted in Dalian. https://bbs.hcbbs.com/thread-5704530-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-11-07
【Ten Years of Rapid Development in Chemical Equipment】The largest domestic project of its kind for continuous polymerization on a scale of 5,000 tons per batch of para-aramid fibers was successfully put into operation between 2021 and 2025. https://bbs.hcbbs.com/thread-5704579-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first 6MPa 3,500-ton gasification furnace developed as part of the Space Long March project was successfully ignited during the pilot operation of the integrated project for clean and efficient utilization of resources in Xinjiang’s Zhongneng Lvyuan area. https://bbs.hcbbs.com/thread-5704592-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.