On September 30, an invitation for bids was issued for the procurement of the water-coal slurry gasification process package and complete sets of gasification furnace equipment for the energy-saving and carbon-reduction renovation project of the synthetic ammonia gasification furnace at Zhongyan Anhui Hong Sifang Co., Ltd. Project Name: Purchase of Water-Coal Slurry Gasification Process Package and Complete Set of Gasification Furnace Equipment for the Energy-Saving and Carbon-Reduction Transformation Project of the Ammonia Synthesis Gasification Furnace at Sinohsalt Anhui Hongsi Fang Co., Ltd. Tender Number: 0703-2540CIC2P139 Project Overview: The existing ammonia synthesis system at Sinohsalt Anhui Hongsi Fang Co., Ltd., with an annual production capacity of 300,000 tons, utilizes the multi-element coal slurry technology developed by the Northwest Research Institute of Chemical Industry. The gasification furnaces in this system have low thermal efficiency, high energy consumption, a short service life, and high maintenance costs. The semi-waste-boiler water-coal slurry gasification technology is proposed to be used for the energy-saving and carbon-reduction retrofit of existing ammonia synthesis gasification units, in order to reduce the energy consumption of these units and lower CO2 emissions. Project location: SinoSalt Anhui Hongsi Fang Co., Ltd., Circular Economy Demonstration Park, Feidong County, Hefei City, Anhui Province. Scope of the tender: The scope of this tender includes the design, manufacturing, supply, partial installation, commissioning, and technical services related to one set of gasification equipment using semi-wet coal slurry gasification technology with a coal feeding rate of 1,500 tons per day, within the scope of the applicable technology license. The specific details are as follows:
(1) 1 set of semi-wet coal slurry gasification technology with a coal feeding rate of 1,500 tons per day (including proprietary technology, patent licenses, and technical services). The main technical requirements are as follows:
(2) Responsible for the design, manufacturing, supply, and partial installation of a complete set of semi-water-cooled coal slurry gasification furnaces with a coal feeding capacity of 1,500 tons per day, within the scope of one technical license; the main equipment and key technical requirements are as follows:
【Haichuan’s Big Spending on National Day】On the first day of the National Day holiday, did you sleep in today? ? ? https://bbs.hcbbs.com/thread-5702275-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan’s Big Spending on National Day】On the first day of the National Day holiday, did you sleep in today? ? ? https://bbs.hcbbs.com/thread-5702275-1-1.html (Source: Haichuan Chemical Industry Forum)
Give praise and encouragement to the achievements made in China’s chemical technology and equipment sector
【Haichuan’s Grand Spending on National Day】The huge traffic jams during trips on National Day – were you lucky enough to experience them? ? https://bbs.hcbbs.com/thread-5702336-1-1.html (Source: Haichuan Chemical Industry Forum)
【HaiChuan’s Big Spending on National Day】During the National Day holiday, where did you go on trips? https://bbs.hcbbs.com/thread-5702425-1-1.html (Source: HaiChuan Chemicals Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】An in-depth look at how pig manure can be turned into green ship fuel: Shanghai launches its first project for purifying biogas into biomethane https://bbs.hcbbs.com/thread-5702307-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan’s Grand Spending for National Day】No matter how high the mountains and far the distances, the moon over home remains full! https://bbs.hcbbs.com/thread-5702569-1-1.html (Source: Haichuan Chemical Industry Forum)