Thread Content
Sinopec Xinxing Ulanqab’s 100,000-ton/year wind-solar hydrogen project – photovoltaic power generation component registered 2025-11-11 15:09:14 On November 7, the “Ulanqab 100,000-ton/year integrated wind-solar hydrogen production project (photovoltaic power generation section)” was registered in Shangdu County. The project is being built by Sinopec Xinxing (Inner Mongolia) West Hydrogen to East Transmission New Energy Co., Ltd., which means that Sinopec has taken another step forward in its efforts in the field of hydrogen energy. Construction location: Ulanqab City – Shangdu County – Liguhujing Township and Shibaqing Town. Total investment: 2,922.9 million yuan, of which 876.87 million yuan comes from own funds, 2,046.03 million yuan from bank loans, and 0 million yuan from other sources. Planned construction period: from June 2026 to December 2028. Scale and scope of the project: Construction of 800.8 MW of solar photovoltaic power generation capacity, comprising 182 photovoltaic arrays; in addition, two 220 kV step-up substations along with related roads will be built, with each substation featuring two 200 MVA main transformers. Additional note: The project registration notification serves as the initial basis for project applicants to carry out preliminary preparations for their investment projects. With this notification issued by the project registration authority, applicants must comply with the requirements set by various industry authorities and go through relevant procedures such as those related to energy conservation, land use, resource utilization, planning, work safety, environmental protection, water extraction permits, cultural heritage protection, soil and water conservation plans, as well as construction permits. This notification of record shall not serve as a basis for the commencement of the project. In accordance with the relevant requirements of the competent authorities in various industries, if the project applicant proceeds with the work without completing the aforementioned necessary procedures, they shall bear full responsibility for the consequences. The project owner must construct in strict accordance with the details specified in the notice; they are not allowed to change the construction location, project funds, scope, or scale without authorization. They must also implement proper safety measures and environmental protection measures, and enter the project-related information into the project submission platform in a timely manner.
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful First Operation of the Pilot Plant for Producing Liquid Fuels via Hydrogenation of High-Temperature Coal Tar, 2813–2025, Qingdao Institute of Energy, Chinese Academy of Sciences https://bbs.hcbbs.com/thread-5704913-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2794–2025: Chinese scientists overcome the high-carbon-emission challenge in Fischer-Tropsch synthesis, giving this century-old process a low-carbon future https://bbs.hcbbs.com/thread-5704322-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2796-2025: Construction Management for Ethylene Process Piping Projects at Huanqiu Liu Jian’s Tarim Project Site – Completion of All Tasks https://bbs.hcbbs.com/thread-5704422-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Donghua Company’s graphene-based anti-corrosion coatings produced via gas-phase synthesis were included in the list of innovations recommended by central state-owned enterprises. https://bbs.hcbbs.com/thread-5705057-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 2×15 megawatt supercritical carbon dioxide-based waste heat power generation demonstration project was connected to the grid between 2015 and 2025. https://bbs.hcbbs.com/thread-5704984-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 2×15 megawatt supercritical carbon dioxide-based waste heat power generation demonstration project was connected to the grid between 2015 and 2025. https://bbs.hcbbs.com/thread-5704984-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2816 to 2025: The robot-based automatic loading machines developed by Changzhou Daojin have solved the problem of difficult loading. https://bbs.hcbbs.com/thread-5705014-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】The key technology project for \"converting coal into high-end carbon materials\" carried out by Zhaoqing Shunxin from 2005 to 2025 has passed evaluation. https://bbs.hcbbs.com/thread-5704595-1-1.html (Source: Haichuan Chemical Industry Forum)