The construction project for Shaanxi Meien’s production line capable of manufacturing 300,000 tons of electronic-grade hydrogen peroxide per year, as well as for the comprehensive utilization of resources, has seen the successful installation of the first extraction tower. Recently, the installation of the first extraction tower was completed in this project, which is under the general contracting of China National Chemical Corporation Tianchen. The achievement of this important milestone marks the official entry of the project construction into the equipment installation phase. The extraction tower being lifted this time serves as the core unit of the hydrogen peroxide production facility; it is responsible for extracting high-purity hydrogen peroxide from crude material. It is 43.7 meters tall and weighs 140 tons. To ensure the safe and efficient progress of the lifting operations, Tianchen Company’s project team adopted \"full-process control and zero-risk operations\" as its core objectives. It took the lead in carrying out comprehensive management across the entire process, including the planning of the tower lifting strategy, foundation inspection, and plan review, thereby laying a solid foundation for the successful completion of the lifting task. During the construction, a 420-ton main crane, a 300-ton tail-swinging crane, and a 50-ton crane were used in conjunction to ensure precise alignment of the tower with its foundation; their professional and efficient workmanship won high praise and recognition from the client. The successful completion of the lifting task for the first extraction tower demonstrates fully the technical expertise and collaborative capabilities of Tianchen Company’s project team, and it has provided valuable practical experience for the lifting of other large-scale equipment such as hydrogenation towers, oxidation towers, and purification towers in the future. Next, the project team will take this milestone as an opportunity to advance the subsequent installation and commissioning work in a comprehensive manner, strictly adhere to the standards regarding construction quality and safety, and make every effort to ensure the successful achievement of the annual construction goals, thereby injecting strong momentum into the high-quality development of the regional economy.
【HaiChuan Safety Discussion Forum】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemicals Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made seawater desalination modules for European methanol projects were officially delivered and shipped, 2829–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful assembly of the DC converter transformer for the world’s first \"sea-land integrated\" flexible DC transmission project from 2025 to 2030 https://bbs.hcbbs.com/thread-5705493-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2028 to 2025! Pilot-scale production technology for domestic high-end polyolefin elastomers has passed the evaluation for scientific and technological achievements. https://bbs.hcbbs.com/thread-5705551-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2833-2025 – Amazing! Nanjing Engineering’s new construction technology for spherical storage tanks based on full-position automatic welding has been put into large-scale use at Maoming Petrochemical https://bbs.hcbbs.com/thread-5705632-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2833-2025 – Amazing! Nanjing Engineering’s new construction technology for spherical storage tanks based on full-position automatic welding has been put into large-scale use at Maoming Petrochemical https://bbs.hcbbs.com/thread-5705632-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The intelligent pipeline welding robot for the period 2834–2025 has been put into use. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The intelligent pipeline welding robot for the period 2834–2025 has been put into use. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The 2834-2025 intelligent pipe full-position welding robot has been put into use officially. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))