Public notice on the environmental impact assessment for the project of Liaoyuan Tianying Hydrogen Energy Technology Co., Ltd. to efficiently utilize carbon dioxide to produce 180,000 tons of green methane per year (Phase I)

2025-11-26View Original

Thread Content

Recently, the Jilin Provincial Department of Ecology and Environment issued a public notice regarding the status of acceptance of the environmental impact assessment report for the project carried out by Liaoyuan Tianying Hydrogen Energy Technology Co., Ltd., which aims at the efficient utilization of carbon dioxide to produce 180,000 tons of green methane per year (Phase I). According to the public announcement, the project of Liaoyuan Tianying Hydrogen Energy Technology Co., Ltd. to efficiently utilize carbon dioxide to produce 180,000 tons of green methane per year (Phase I) is located within the chemical industry park of the Liaoyuan High-Tech Industrial Development Zone. It constitutes the part responsible for the production of green hydrogen and green methane in the \"wind, solar, storage, hydrogen, ammonia, and alcohol integration\" series of projects. The project owner is Liaoyuan Tianying Hydrogen Energy Technology Co., Ltd. The total investment in the project amounts to 450 million yuan. The main construction elements include a methane production facility with an annual capacity of 180,000 tons, a hydrogen production unit with a capacity of 104,000 Nm³/h, a carbon capture unit with a capacity of 32,000 Nm³/h, as well as various supporting infrastructure and auxiliary systems. Upon completion of the project, by capturing carbon dioxide from the flue gases of the boilers in existing biomass power generation plants and carrying out green methane synthesis reactions with the hydrogen produced on-site, it theoretically has the potential to produce 180,000 tons of green methane per year. However, there is a certain gap between the actual production capacity and the scale of the facility; it is expected that after the project is completed, an annual output of 62,000 tons of green methane will be achieved. It is understood that on October 19, 2023, in light of the relevant development context, China Tianying signed an investment cooperation framework agreement with the People’s Government of Liaoyuan City. The two parties reached a series of agreements on deep cooperation regarding the green restoration of abandoned mine pits through gravity energy storage, as well as the development of projects involving wind, solar, energy storage, hydrogen, ammonia, and alcohol. China Tianying plans to build the Jilin Tianying Chemical Project Base in the Liaoyuan High-Tech Industrial Development Zone, and make every effort to advance a series of projects focused on the integration of wind, solar, energy storage, hydrogen, ammonia, and alcohol technologies. This project covers multiple key areas, including wind power generation, biomass power generation, green hydrogen production, green methanol synthesis, and green methane synthesis. Among them, wind power generation projects serve as the \"green power engine\" of integrated projects, providing green electricity support for such projects ; Biomass power generation projects act as \"comprehensive energy suppliers,\" providing biomass electricity, steam, and green carbon for integrated projects ; Green hydrogen production supplies green hydrogen feedstock for integrated projects ; The green methanol synthesis and green methane synthesis projects supply green methanol and green methane products to the integrated project respectively. This integrated project establishes a complete industrial chain that goes from green electricity to green methanol and green methane. Its innovative large-scale, peak-shaving chemical processing system is capable of adapting to the fluctuating characteristics of wind energy and new renewable energy sources, offering significant advantages in both chemical energy storage and clean production. In terms of project planning, the “integrated wind, solar, storage, hydrogen, ammonia, and alcohol” series of projects aims to build 2.6 GW of new energy generation facilities, primarily for wind power generation ; Equipped with a 400,000 Nm³/h electrolytic hydrogen production system for green hydrogen generation ; Construct a 170,000 tons/year methanol plant to achieve planned synthesis of green methanol ; Build 2 × 180,000 tons/year green methane plants to increase the production capacity of green methane ; At the same time, biomass power generation units and associated auxiliary facilities will be constructed to ensure the stable operation of the project.
Reply #22025-11-26
【Haichuan Chemical Safety Documents】Recommended article: Interpretation of the \"Criteria for Identifying Major Accident Hazards in Industrial and Trade Enterprises\" https://bbs.hcbbs.com/thread-5706517-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-11-26
【Haichuan Chemical Plant Accident Case】15 Dead, 180 Injured! Warning from the BP Texas refinery accident: “Budget cuts” can trigger serious cascading risks” https://bbs.hcbbs.com/thread-5706578-1-1.html (Source: HCBBS Chemical Forum)
Reply #42025-11-26
【Haichuan Chemical Accident Case】With multiple safeguards in place, why was it still unable to avoid \"human error\"? Fatal Flaws and Reflections on the “Pipe Opening Operation” Accident at a California Refinery https://bbs.hcbbs.com/thread-5706580-1-1.html (Source: HCBBS Chemical Forum)
Reply #52025-11-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2850 to 2025: HBIS Group launches domestically the first 1700mm ultra-wide-section high-grade petroleum pipeline steel products https://bbs.hcbbs.com/thread-5706292-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-11-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2850 to 2025: HBIS Group launches domestically the first 1700mm ultra-wide-section high-grade petroleum pipeline steel products https://bbs.hcbbs.com/thread-5706292-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-11-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot-scale biomass gasification project developed by Donghua Company in China’s chemical engineering sector began operations in 2025, producing syngas. https://bbs.hcbbs.com/thread-5706633-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #82025-11-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating power using the residual pressure from high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-11-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 660-megawatt ultra-supercritical circulating fluidized bed boiler was approved for use, 2856–2025 https://bbs.hcbbs.com/thread-5706795-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #102025-11-29
【HaiChuan Chemical Construction Technology】The ultimate solution to extend the lifespan of instrument pipelines in winter – starting with electric heat tracing https://bbs.hcbbs.com/thread-5706825-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #112025-11-30
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-class methanol synthesis reactor passed the factory acceptance test. https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.