HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Construction of the mechanical and electrical installation project for the small-scale amino acid production facility at Hengtong (Inner Mongolia) Biotechnology Co., Ltd. has begun

2025-12-03View Original

Thread Content

Recently, the mechanical and electrical installation project for the small-series amino acids production facility of Hengtong (Inner Mongolia) Biotechnology Co., Ltd. officially commenced in the light industry products sector of the Tuoketuo Economic Development Zone in Hohhot. As a core component of living organisms, amino acids are widely used in various fields such as the food industry, agriculture and animal husbandry, as well as medicine and healthcare. The industrial base established by Hengtong Biology focuses on the production of L-tryptophan, L-arginine, L-isoleucine, and feed proteins; these products enjoy strong market demand and broad application prospects. This project focuses on technological innovation and industrial upgrading, injecting new forms of productive capacity into the biopharmaceutical sector. Through genetic modification technology, the fermentation level of the product was increased from the traditional 50 grams to 60 grams, resulting in a significant improvement in product quality. At the same time, the project focuses on the development of smart and green factories; its production lines feature fully automated design and AI-based control systems, enabling an efficient production mode that allows for one-button operation and periodic manual monitoring. This approach has set a precedent in the industry for leveraging artificial intelligence to improve production technologies. “Construction of the project began in mid-June 2024; currently, the infrastructure work has been fully completed, the factory building is enclosed and the windows have been installed, with all the main processing equipment in place. ”Gao Lun, project director of Hengtong (Inner Mongolia) Biotechnology Co., Ltd., explained that in order to ensure trial operation by the first quarter of 2026, the project team overcame the challenges associated with construction in winter by activating the heating system in the factory buildings in advance, so as to maintain indoor temperatures that meet the requirements of the manufacturing process. Currently, the indoor installation work for winter is progressing in an orderly manner, with plans to officially enter the testing phase in March next year. It is understood that once the mechanical and electrical installation project for the small-scale amino acid industry base is completed, it will be able to produce over 14,000 tons of amino acid products per year, with annual sales revenue estimated at 500 million yuan; this will enable the employment of more than 200 people.
Reply #22025-12-03
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2028 to 2025, Ansteel pursued the project aimed at achieving domestic production of steel catenary risers and related components for oil and gas exploration; the first batch of welded steel catenary riser products developed as part of this project were launched globally. https://bbs.hcbbs.com/thread-5707125-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #32025-12-03
【Ten Years of Rapid Development in Chemical Engineering Equipment】2859-2025: Datong’s first-phase pilot project for the production of high-performance domestic carbon fiber of the 12K small tow T1000 grade, with an annual production capacity of 200 tons. https://bbs.hcbbs.com/thread-5706912-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42025-12-03
【Ten Years of Rapid Development in Chemical Equipment】2860-2035: Amazing! Lifting of the 220-meter-span, 3,600-ton dome truss in Asia’s largest \"fish-shaped\" water park – steel structure truss lift https://bbs.hcbbs.com/thread-5706919-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-04
【Ten Years of Rapid Development in Chemical Engineering Equipment】The submarine pipeline stability analysis software developed independently by CNOOC Engineering, 2862-2025, has obtained certification from the China Classification Society, filling a gap in this field. https://bbs.hcbbs.com/thread-5706988-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #62025-12-05
【Ten Years of Rapid Development in Chemical Equipment】After 13 years of trial production from 2863 to 2025, a breakthrough was achieved, breaking foreign monopolies! Successful trial production of 17-meter ultra-long ultra-high-pressure steel pipes in our country https://bbs.hcbbs.com/thread-5706989-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-06
【Ten Years of Rapid Development in Chemical Equipment】2865-2025: Turning Waste into Treasure! Shenzhen Institute’s 100-kilowatt oil and gas wastewater hydrogen production system converts wastewater into green hydrogen https://bbs.hcbbs.com/thread-5707067-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #82025-12-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2028 to 2025, Ansteel pursued the project aimed at achieving domestic production of steel catenary risers and related components for oil and gas exploration; the first batch of welded steel catenary riser products developed as part of this project were launched globally. https://bbs.hcbbs.com/thread-5707125-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #92025-12-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-08
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.