Thread Content
On January 27, the Inner Mongolia Rongxin HDPE project, which is under the general contracting of CNPC Jilin Chemical Engineering Co., Ltd. (a subsidiary of China National Petroleum Corporation, referred to as “Huanqiu Jilin Company”), reached an important construction milestone as the final batch of concrete was poured, completing the structural construction of the powder handling and recycling framework. The achievement of this key milestone indicates that the project is advancing steadily toward its established goals at an \"accelerated pace\". The powder handling and recycling facility that has been completed this time is a concrete frame structure, with a building height of 29.6 meters and a height of 1.4 meters for the surrounding beams. During the construction process, a total of 600 tons of reinforcement was installed in the superstructure, and the total volume of concrete poured amounted to 1,700 cubic meters, of which 524 cubic meters were poured during this topping-out phase. The construction efficiency of this monomer is high; on average, one layer of the structure is completed every 22 days, and it took 88 days to successfully finish the concrete work for all four layers of the superstructure. As the final key construction milestone in 2025, all the civil engineering tasks for the project have been successfully completed, laying a solid foundation for the subsequent installation of steel structures and equipment. While the construction of the main structure is progressing, the installation work for the project is also advancing steadily. To date, the total weight of the steel structure for the project is 6,568 tons; 1,055 tons have been delivered and 580 tons have been installed ; There are a total of 187 units of static and dynamic equipment; 48 units have arrived, and 23 units have been installed. As planned, the delivery of all steel structures except for the extruder will be completed by December, with an estimated equipment delivery rate of 78%. Next, the project will enter a peak period in December for the installation of steel structures and equipment. The HDPE project department of Inner Mongolia Rongxin, under Global Jilin Company, stated that it will seize this opportunity, keep working hard, continuously improve the construction organization, strengthen coordination, and ensure that safety, quality, and progress are all advanced simultaneously, thereby moving steadily toward the successful completion of the project.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The submarine pipeline stability analysis software developed independently by CNOOC Engineering, 2862-2025, has obtained certification from the China Classification Society, filling a gap in this field. https://bbs.hcbbs.com/thread-5706988-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2865-2025: Turning Waste into Treasure! Shenzhen Institute’s 100-kilowatt oil and gas wastewater hydrogen production system converts wastewater into green hydrogen https://bbs.hcbbs.com/thread-5707067-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2867 to 2025, CNOOC Engineering took the lead in developing a device for detecting the bell mouth angle of cable-laying machines, which has been successfully put into use. https://bbs.hcbbs.com/thread-5707082-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications from 2028 to 2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications from 2028 to 2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: HaiChuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: HaiChuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The coal-based α-olefin-based technology for producing medium-low viscosity mPAO, independently developed by Guoneng Group, was successfully put into operation for the first time: https://bbs.hcbbs.com/thread-5707383-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))