【Haichuan Overseas Engineering】Sets a new record! The main structure of 2 large crude oil storage tanks with a capacity of 25,800 cubic meters was installed in 55 days at the Rumaila MQ project in Iraq

2025-12-24View Original

Thread Content

Recently, Team 316 of CNPC First Construction Company employed a hydraulic jacking inversion method during the construction of large crude oil storage tanks at the Rumaila MQ project in Iraq. It managed to complete the installation of the structures for two large crude oil storage tanks with a capacity of 25,800 cubic meters each in just 55 days, setting a new record for construction efficiency in similar projects overseas. The two storage tanks being constructed this time have a diameter of 45.6 meters, a height of 21.9 meters, and a weight of 520 tons; they face challenges such as a tight schedule and limited space. Compared to the traditional construction methods, which suffer from excessive reliance on scaffolding, long construction periods, and high safety risks, Team 316 innovatively adopted a hydraulic jacking top-down construction technique, transforming high-altitude work into ground-based operations and thereby significantly improving construction safety and efficiency. During construction, the project team first completed the installation of the tank bottom and top. By using specialized hydraulic equipment, along with meticulous organization and advanced synchronization control systems, and through the coordinated efforts of various teams, key processes such as the installation of tank panels, lifting and alignment, and welding were carried out smoothly. This approach reduced the installation time for a single set of wall panels from 10 days to 8 days, allowing both tanks to be constructed simultaneously. Ultimately, the project not only met all planned milestones safely and to high standards, with a first-pass weld qualification rate of 99.6% – far exceeding industry standards – but also achieved improvements in safety, quality, and efficiency.
Reply #22025-12-24
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with images and text; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestically produced high-sulfur content compression unit at the Puguang Gas Field has operated for over 20,000 hours (2914–2025) https://bbs.hcbbs.com/thread-5709131-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-25
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #62025-12-25
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at tens of thousands of revolutions per minute, as well as motors with a vacuum distribution system capable of handling hundreds of thousands of revolutions per minute, have passed the evaluation process. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.