HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Zhejiang Shixian New Materials Co., Ltd. – Green Integrated Production of High-End New Materials from Recycled Resources (Phase 1)

2025-12-06View Original

Thread Content

On December 4, the Huzhou Ecology and Environment Bureau issued a notice intending to provide its approval comments on the environmental impact assessment documents for construction projects (non-nuclear and non-radiological). Project Name: Zhejiang Shixian New Materials Co., Ltd. – Green Integrated Production of High-End New Materials from Recycled Resources (Phase I)
Location of Construction: Lingang Chemical Industrial Park, Meixi Town, Anji County
Constructor: Zhejiang Shixian New Materials Co., Ltd.
Project Overview: An additional 330 mu of land will be utilized to make full use of bamboo biomass resources, with 2 gasification units capable of producing 200,000 tons per year being built. It is capable of producing 32,000 tons per year of polyimide materials, 104,000 tons per year of cleaning agents specifically for electronic use (high-purity methanol), 113,000 tons per year of diluents for electronic use (solvents for battery electrolytes: dimethyl carbonate, methyl ethyl carbonate, diethyl carbonate), as well as various bulk gases for electronics (hydrogen, nitrogen, argon). At the same time, the plant is equipped with auxiliary facilities such as gas turbine units with a combined capacity of around 25 MW, waste gas incineration systems, and air separation and air compression units. Approximately 738 new units of equipment such as gasifiers, reactors, storage tanks, distillation towers, steam turbines, compressors, and heat exchangers have been added. The project was developed through a partnership between the company and China Chemical Sideng Ningbo Engineering Co., Ltd., using the EPC turnkey contract model; the official contract was signed in November 2023.
Reply #22025-12-06
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-12-06
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2867 to 2025, CNOOC Engineering took the lead in developing a device for detecting the flare angle of cable-laying machines, which has now been successfully put into use. https://bbs.hcbbs.com/thread-5707082-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-08
【Ten Years of Rapid Development in Chemical Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62025-12-08
【Ten Years of Rapid Development in Chemical Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72025-12-09
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemistry Company managed to achieve the domestic production of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #82025-12-10
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for hexanitronic acid via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year hexanitronic acid production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #92025-12-10
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via synthetic gas biofermentation at a capacity of 50,000 tons per year successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.