Thread Content
Recently, significant progress was made on the EPC project for the New Materials Innovation Testing Base (pilot plant) in the Lu’an Yejí Chemical Industrial Park: the main structures of all 15 individual construction units have been fully completed, laying a solid foundation for the subsequent phases of the project. This project is a key industrial project in Yeji District, Lu’an City. It covers an area of approximately 52.4 mu, with a total construction area of 20,790 square meters, and includes all necessary facilities such as pilot production workshops, hazardous materials storage areas, and comprehensive administrative buildings. Upon completion, the project will create a comprehensive industrial platform that integrates new material research and development with pilot-scale production, thereby driving the transformation and upgrading of regional industries as well as their high-quality development. Since the project began, in the face of numerous challenges such as a tight schedule, variable weather conditions, limited site space, and high construction standards, all the staff and workers in the project team have faced these difficulties head-on and worked tirelessly. They formulated scientific construction plans and allocated resources effectively to ensure smooth coordination among all stages of the work ; Strictly implement safety inspection and quality inspection systems, ensure control over all stages of the process, and firmly uphold the safety standards ; Organize on-site construction meticulously, strengthen progress coordination and resource integration, and make every effort to ensure the efficient advancement of construction tasks. After more than four months of hard work, the project successfully completed the topping out of all its individual structures on schedule, meeting the key milestones set; this demonstrates the project team’s strong professional skills and efficient execution ability.
【Haichuan Chemical Valve Management】Series of Posts—Proper management of valves is the foundation for stable operation. Everyone is welcome to share and exchange ideas! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719309 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Haichuan Teahouse】Breaking rules occasionally is a beauty, but doing so routinely is a disaster. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720639 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haimen Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【History of Haichuan Chemical】==60 Years since the Founding of Sichuan Air Compressor Factory https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720720 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【History of Haichuan Chemical Industry】The furnace fire reflects a loyal heart; its spirit endures through the ages — Mr. Fan Congzhen, the father of boilers in China https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720823 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Haichuan Chemical Valve Management】Series of Posts – Avoid losses: 25 key points for checking valve installation and use! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720885 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest offshore converter station, 3126-2026, is set to be installed at sea https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720572 (Source: Haichuan Chemical Industry Forum (HCBBS))
【History of Haichuan Chemical】The Taixing Fertilizer Plant that no longer exists on the Internet: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721001 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))