HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hebei Chemical New Materials Project: 5,000-ton + 4,000-ton super cranes used together to lift a 207-ton naphtha distillation tower

2025-12-09View Original

Thread Content

The first large component of the Hebei Chemical New Materials project has been installed; a combination of 5,000-ton and 4,000-ton cranes will once again work together to lift the raffinate tower! ▼ According to CPECC First Construction Company, on December 5th, at the site of the Hebei Chemical New Materials Base project, the company’s large-scale equipment lifting and transportation division successfully completed the lifting of the first piece of equipment – a naphtha distillation tower that is 63.2 meters tall and weighs 207 tons, which was placed in position with precision. For this lifting operation, a 1,350-ton crawler crane was used as the main crane, while a 250-ton crawler crane served as the auxiliary crane; the combined effort of these two cranes ensured that the equipment was placed in its correct position. This achievement marks the official entry of this project into the phase of lifting heavy objects. To ensure the safe installation during this lifting operation, thorough preparations were made in advance: multiple rounds of scheme evaluation and efficient coordination on-site ; Thorough analysis, comprehensive risk assessment, and full-process control and supervision. Ultimately, there were no errors during the lifting process, which provided valuable experience for lifting equipment weighing 14,000 tons in the future, boosted the confidence of the team involved in the work, and offered strong support for the smooth progress of the entire project. Next, the project will proceed with the lifting of the key plant equipment: the raffinate tower. At that time, the MYQ 5000-ton gantry crane will work together with the 4000-ton crawler crane for the third time. Previously, this \"golden duo\" had successfully completed similar tasks in the projects in Guangdong and Panjin, and their departure once again is highly anticipated. In the subsequent work, the 4,000-ton crawler crane still needs to complete 7 safety transfers as well as the lifting operations for 7 pieces of equipment. Each task will be carried out in strict accordance with the operating procedures, ensuring safety while also paying attention to quality and progress, thereby laying a solid foundation for the project’s eventual commissioning.
Reply #22025-12-10
【Common Issues in Haichuan Pipeline Design】--Valves in confined spaces such as pits require extended operating mechanisms to reduce risks https://bbs.hcbbs.com/thread-5707433-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-12-10
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for hexanitrobenzene via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year hexanitrobenzene production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #42025-12-10
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via synthetic gas biofermentation at a capacity of 50,000 tons per year successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】The submarine pipeline stability analysis software developed independently by CNOOC Engineering, 2862-2025, has obtained certification from the China Classification Society, filling a gap in this field. https://bbs.hcbbs.com/thread-5706988-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #62025-12-11
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2893 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via synthetic gas biofermentation at a capacity of 50,000 tons per year successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #92025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102025-12-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】2892–2025: The world’s first 630°C secondary reheating thermal power project – The bypass system for the 2×1000MW ultra-supercritical secondary reheating steam turbines at Datang Yuncheng. Link: 289 https://bbs.hcbbs.com/thread-5707850-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #112025-12-13
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2893 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.