Thread Content
The Xinhe Chuaneng project, with an annual production capacity of 100,000 tons of hydrogen and 500,000 tons of methanol (including applications related to energy storage, photovoltaic technology for desert control, as well as integrated systems for power generation, transmission, distribution, and storage), is located in Xinhe County, Aksu, Xinjiang. It was invested in and built by Xinhe Chuaneng New Energy Hydrogen Production Co., Ltd. Build a project with an annual production capacity of 100,000 tons of hydrogen and 500,000 tons of methanol (including applications related to energy storage, photovoltaic desert management, as well as source-grid-load-storage systems). The total investment for the project is 788 million yuan.
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHIHE Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsecured and Not Properly Sealed Aluminum Insulation Layers for Pipes https://bbs.hcbbs.com/thread-5708978-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2010 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestically produced high-sulfur content compression unit at the Puguang Gas Field has operated for over 20,000 hours (2914–2025) https://bbs.hcbbs.com/thread-5709131-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))