The post-treatment system of the styrene-butadiene rubber unit in the 1.2 million tons per year ethylene project of Dushanzi Petrochemical’s Tarim Phase II was successfully started up for the first time

2026-04-23View Original

Thread Content

The post-treatment system of the styrene-butadiene rubber unit in the 1.2 million tons per year ethylene project of Dushanzi Petrochemical’s Tarim Phase II was successfully started up for the first time. It marks a substantial breakthrough in the construction of the key downstream units of this **pilot project. It is a tangible outcome of the company’s approach of using operations to drive construction, stability, and improvement, and it lays a solid foundation for the safe and efficient progress of the project as well as for its successful commissioning from the very first attempt. The test run was smooth, efficient, and orderly. It takes only 7 minutes from raw material feeding to the successful production of qualified gel particles in the dryer ; Subsequently, the compactor successfully produced the first piece of uniform rubber block, the packaging line was put into operation simultaneously, and the entire post-treatment process was enabled to operate in a continuous manner from start to finish. At 17:06 on that day, the system stopped safely and smoothly in accordance with the established procedure. From feed intake to the production of qualified products, the entire process takes only 15 minutes; the various stages are closely linked, and the parameters remain stable and under control, thus successfully achieving the goal of a high-quality first run. The reprocessing unit was the first to carry out reverse operation, allowing for the early identification and correction of issues related to equipment, instruments, electrical systems, and operational interfaces; this effectively tested the quality of the construction and installation as well as the reliability of system operation. For Dushanzi Petrochemical, this commissioning process helped to train the operating staff and gain initial experience in starting up the plant. It marked a smooth transition from the construction phase to the production preparation phase, removing obstacles and boosting confidence for the subsequent successful operation of key units such as those for upstream cracking. It is a crucial step in ensuring the successful commissioning of the entire project at once and achieving operational efficiency as soon as possible. Since the official commencement of construction in July 2024, all teams involved in the project have worked hard to overcome various challenges, including extreme weather conditions, complex geological conditions, and tight deadlines, while coordinating the progress of all construction tasks. At the final stage of the project sprint, the personnel from all participating units fulfilled their duties and worked together to overcome challenges, demonstrating a strong sense of responsibility. Once the unit was successfully commissioned, the project team promptly analyzed and summarized the experience gained from the testing phase. In collaboration with various relevant parties, they carried out a thorough inspection, cleaning, and maintenance of the production line to ensure its long-term stable operation. Next, the project team will continue to strengthen accountability, steadily advance key tasks such as the commissioning of subsequent units and intermediate handovers, and make every effort to ensure that the facility can operate successfully, stably, over extended periods, and generate profits. This will help to turn the Tarim Phase II ethylene project into a high-standard **model project**, thereby providing strong impetus for the upgrading and development of the local industry.
Reply #22026-04-23
【History of Haichuan Chemical】The Defunct Fertilizer Plant – Cixi Fertilizer Plant https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718362 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32026-04-23
【Haichuan Teahouse】The unique beauty of a piece of wood that has been shaped by time https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718372 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #42026-04-23
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an internationally leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-04-24
【Ten Years of Rapid Development in Chemical Equipment】The pilot-scale plant for the bio-based furan dicarboxylic acid technology developed by Dalian Institute of Chemical Physics was successfully put into operation: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718433 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-04-24
【Ten Years of Rapid Development in Chemical Equipment】3094-2026: Filling the Gap! Breakthrough achieved in China’s large-scale production technology for high-end oxalates https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718443 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-04-25
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 3095 to 2026! China’s hydrogen pipeline project secures first order in Europe https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718447 (Source: HCBBS Chemical Forum)
Reply #82026-04-25
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestically produced polypropylene extrusion granulation unit was successfully tested in its first attempt, 3096–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718476 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-04-25
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestically produced polypropylene extrusion granulation unit was successfully tested in its first attempt, 3096–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718476 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-04-26
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #112026-04-26
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.