On December 23, the EO reactor for the Shaanxi Yueneng Fine Chemicals project was successfully lifted into place. It is reported that the equipment to be lifted this time has a net weight of 775 tons, a diameter of 6.39 meters, and a height of 22.43 meters. At the lifting site, a 1600-ton crawler crane owned by Sinochem Second Construction’s Heavy Machinery Company was used. With a 54-meter main boom for lifting operations, and thanks to a scientific setup featuring a placement radius of 15 meters, a lifting radius of 21 meters, and a lifting counterweight of 450 tons, this crane set a new record for the heaviest load lifted by this model of crawler crane to date, enabling the precise placement of the equipment. This successful lifting of the EO reactor has injected strong momentum into the construction of the Yueneng Fine Chemicals project, sounding an era-defining note of perseverance and determination in the face of challenges amidst the harsh winter conditions.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Friends in the North, Check More! ! No warnings in place below where water vapor condenses into ice spikes in pipes https://bbs.hcbbs.com/thread-5709472-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2915-2025 – Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2921 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at tens of thousands of revolutions per minute, as well as motors with a vacuum distribution capacity of 100,000 units, have passed the evaluation process. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to receive carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】First of its kind in China from 2928 to 2025! Pilot production of Ordos’ “sand thermal battery” a success! https://bbs.hcbbs.com/thread-5709536-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))