The third batch of large-scale equipment for the supporting renovation project at Jiujiang Petrochemical has been officially shipped

2026-04-12View Original

Thread Content

From April 7th to 8th, the third batch of large-scale equipment to be transported using overhead cranes for the Jiujiang Petrochemical upgrading project was officially shipped. This batch consists of 10 such pieces of equipment, the largest number ever transported in such shipments; they are all core process equipment that are crucial for the overall progress of the project. Starting from March 29th, these large pieces of equipment were gradually delivered to the China Railway Jiuqiao Wharf. During the Qingming Festival, relevant personnel remained on site around the clock, working overtime to organize the unloading of the equipment onto land, thereby accelerating the preparation work for transportation. It is reported that this transportation task will be carried out in 3 batches. The route will include urban roads such as Xundong Expressway. To minimize the impact on city traffic, various departments have drawn on the experience gained from transporting the previous two batches of equipment and implemented strict safety measures to ensure that each piece of equipment arrives at the project site safely and smoothly. The goal is to complete all transportation tasks by April 30th, thus ensuring the smooth commissioning of the aromatics project.
Reply #22026-04-12
【Ten Years of Rapid Development in Chemical Equipment】3080–2026: China’s first comprehensive evaluation standard for smart factories – the \"General Rules for Evaluating Smart Factories\" (GB/T 46734—2025). **The standard has been officially implemented.** https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717616 (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #32026-04-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】3083-2026: SHENGU manufactures China’s first single-stage cantilevered fully assembled centrifugal compressor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717804 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-04-16
【Ten Years of Rapid Development in Chemical Equipment】Successful One-Time Commissioning of Lianyungang’s World’s First Process for Converting Light Hydrocarbons into Ethylene Glycol, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
Reply #52026-04-17
【Ten Years of Rapid Development in Chemical Processing Equipment】China National Petroleum’s first megawatt-class PEM hydrogen production system passed the authoritative CNAS testing and certification https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717958 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-04-17
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The Use of Submersible Long-Shaft Pumps for Oil-Contaminated Sewage Pumps in Tank Areas https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717995 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.