HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Evonik’s specialty amine expansion project has been officially put into operation

2026-04-22View Original

Thread Content

On April 21, the expansion project for Evonik’s specialty amines, undertaken by Nanjing Engineering Company, was officially put into operation. Specialty amines are key additives in the production of polyurethane foam, and they are widely used in industries such as automotive, construction, home furnishings, and consumer goods. At the same time, it can also be used as a curing agent for epoxy systems in products such as anti-corrosion coatings and adhesives. The new generation of reactive specialty amines not only improve production efficiency and product performance, but also offer advantages such as higher energy efficiency, lower odor, and reduced emissions of harmful volatiles. The expanded Evonik Nanjing facility now possesses the capability for commercial-scale production of advanced reactive specialty amines, offering reliable solutions for applications in high-performance polyurethanes and epoxy curing agents that are subject to increasingly strict emission standards. This project utilizes the world’s most advanced production technology for specialty amines, with both the basic design and detailed design being carried out independently by the company. Since the initiation of the basic design phase, the project design team has worked closely with the owner’s management team, adhering to a working approach that gives priority to process safety, emphasizes compliance in design, seeks to improve quality while reducing costs, and takes into account the requirements for practical operation and maintenance. Given the large number of sophisticated equipment units and the complexity of aligning with foreign technical standards, thorough discussions were carried out regarding the design parameters of key equipment, as well as process safety analysis and design optimization, to ensure that the design solutions not only meet the requirements of advanced processes but also take into account construction feasibility and ease of operation and maintenance. During the construction period, designers were stationed on site to quickly resolve technical issues, providing comprehensive design support to ensure the successful commissioning of the project from start to finish. Through coordinated management to reduce costs and improve efficiency, the procurement team adheres to the principles of \"safety, timeliness, sustainability, and cost-effectiveness\", proactively addressing the needs of clients in order to cut procurement costs and shorten delivery times ; Work with the design team to facilitate the rapid release of purchase requests ; It is linked in real time with the site to ensure that supplies arrive at the right time. For long-cycle and critical equipment, establish an urgent delivery tracking system and a regular coordination mechanism to strengthen the monitoring of manufacturing and logistics progress. During the inspection phase, factory inspections, verification at key points, and third-party acceptance upon delivery are strictly implemented to ensure closed-loop management of quality issues. By reversing the schedule and overcoming various challenges during construction, the project team maintained close communication with the owner and supervisor, anticipating potential problems in advance. They successfully managed the pressures associated with the tight timing and heavy workload involved in carrying out repairs and Tie-in work alongside underground pipeline installations, addressed the adverse effects of the rainy season, and overcame challenges such as having both old and new systems in operation at the same time and complex geological conditions. Given the large number of sophisticated equipment and the frequent need for communication with foreign parties, the project team monitored in detail the design, procurement, and installation milestones of key equipment. By adjusting the schedule based on on-site conditions and implementing dynamic management, a solid foundation was laid for the project’s commissioning.
Reply #22026-04-22
【Haichuan Teahouse】Amidst the passage of time, there is still a glimmer of life! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718311 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-04-22
【Ten Years of Rapid Development in Chemical Processing Equipment】3088-2026: China’s first pilot project for producing high-quality synthetic crude oil using green hydrogen in combination with low-quality heavy oil has been launched. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718140 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-04-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The “high-efficiency hydrogen production and hydrogenation integrated unit” technology developed by Dalian Institute of Chemical Physics from 2031 to 2026 passed the evaluation for scientific and technological achievements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718315 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-04-23
【History of Haichuan Chemical】The Defunct Fertilizer Plant – Cixi Fertilizer Plant https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718362 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #62026-04-23
【Haichuan Teahouse】The unique beauty of a piece of wood that has been shaped by time https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718372 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #72026-04-23
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an internationally leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-04-24
【Ten Years of Rapid Development in Chemical Equipment】The pilot-scale plant for the bio-based furan dicarboxylic acid technology developed by Dalian Institute of Chemical Physics was successfully put into operation: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718433 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-04-25
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 3095 to 2026! China’s hydrogen pipeline project secures first order in Europe https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718447 (Source: HCBBS Chemical Forum)
Reply #102026-04-25
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Thermometers and temperature measurement devices installed in storage tanks not being calibrated regularly https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718501 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #112026-04-25
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Thermometers and temperature measurement devices installed in storage tanks not being calibrated regularly https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718501 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.