Thread Content
On December 23, the FDPE plant, constructed by the Full-Density Polyethylene project team of Nantong Lanhai New Materials, which is part of Jilin Chemical Construction’s Fifth Branch, reached an important milestone: all 6 core towers required for the project were delivered to the construction site safely and on time, thus accelerating the subsequent installation work. The 6 tower units present this time are the key core equipment of the FDPE plant; they feature large specifications, high technical requirements, and present difficulties in transportation. The tallest of these towers reaches 87.1 meters in height, has a diameter of 3.6 meters, and weighs around 270 tons; this imposes extremely high demands on transportation arrangements, on-site receipt, and subsequent installation. The project team adheres to the principle of \"prioritizing equipment and planning first,\" and initiates preparations for the arrival of equipment in advance. By focusing on key aspects such as transportation routes, timing of delivery, on-site storage conditions, and lifting requirements, it formulates specific support plans to ensure the smooth arrival of the equipment. During the delivery of the equipment, the project department strictly fulfilled its responsibilities for on-site management, strengthened coordination with the manufacturer, transportation agencies, and other parties involved in the project, and arranged the delivery process in a systematic manner to ensure that all towers were delivered on schedule and in an orderly fashion. Upon the arrival of the equipment, the project department promptly assembled professionals in fields such as technology, quality control, and safety to carry out acceptance inspections together with the owner and the supervision unit. In strict accordance with the design documents and relevant standards, they conducted thorough checks on the equipment’s appearance quality, dimensional accuracy, nameplate information, factory certification, as well as non-destructive testing reports, to ensure that the equipment met quality requirements and was in good condition. Upon inspection, it was confirmed that all parameters of the 6 core towers meet the design and specification requirements, satisfying the conditions for installation.
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at 10,000 revolutions per minute and motors with a vacuum distribution capacity of 100,000 have passed the evaluation tests. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to obtain carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】First of its kind in China from 2928 to 2025! Pilot production of Ordos’ “sand thermal battery” a success! https://bbs.hcbbs.com/thread-5709536-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】First-of-its-kind domestic unmanned emergency rescue equipment set released 2933-2025 https://bbs.hcbbs.com/thread-5709649-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))