HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Quan Ganxi 1×170t/h Dry Quenching of Coking Co., Ltd. in Shanxi Hejin – Distributed Power Generation Project

2025-12-29View Original

Thread Content

I. Project Overview
Project Name: Construction of a distributed power generation facility supporting a 1×170t/h dry quenching system for coking coals
Project Owner: Shanxi Sunshine Coking Group Co., Ltd.
Location: Within the premises of Shanxi Sunshine Coking Group Co., Ltd., Hejin Economic and Technological Development Zone
Total Investment: 53.5693 million yuan
Land Area: 2,346.5014 m²
Building Area: 2,040.51 m²
Construction Scale and Scope: 1x25MW extraction-type steam turbine generator set, turbine hall, air cooling island, and associated electrical control systems. A N25-3.43/435 type medium-temperature and medium-pressure condensing direct air-cooled steam turbine unit will be installed, along with a QF3-25-2 type generator; the rated power of this generator is N=25000kW, and its rated voltage is U=6300V. II. Public display period: From December _, 2025, to December _, 2025. III. Methods of public announcement: (1) On-site public announcement: at the office premises of the Hejin Economic and Technological Development Zone and at the project construction sites. (II) Public announcement on the website: The WeChat official account of Hejin Economic and Technological Development Zone.
Reply #22025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-29
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】First-in-China set of unmanned emergency rescue equipment released for 2025 https://bbs.hcbbs.com/thread-5709649-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52025-12-29
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #62025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs Achieved from 2935 to 2025! The first phase of pipeline-laying work for China’s largest offshore pipeline project has been successfully completed. https://bbs.hcbbs.com/thread-5709667-1-1.html (Source: HCBBS Chemical Forum)
Reply #82025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first large-scale basalt steel material deep-sea aquaculture floating platform was successfully launched between 2025 and 2937. https://bbs.hcbbs.com/thread-5709754-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #92025-12-31
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #102025-12-31
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.