HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Guangxi Taisheng’s total investment is 156. 700 million yuan green fiber full-industry chain base project

2025-12-29View Original

Thread Content

Project Name: Guangxi Taisheng Green Fiber Full Industrial Chain Base Project
Launch Date: December 29, 2025
Location: Guangxi
Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Fibers/Synthetic Fibers
Project Owner: Taisheng (Guangxi) Bamboo Resources Development Co., Ltd.
Total Investment: 1,567.4 million yuan
Current Progress: Public announcement of the feasibility study results
Construction Location: Wulin Park, Economic and Technological Development Zone, Guigang City, Guangxi Zhuang Autonomous Region
Construction Scope: Construction of a production line for 1 million tons per year of bleached sulfate wood (bamboo) pulp, as well as production lines for 450,000 tons per year of specialty paper and 500,000 tons per year of household paper, along with related supporting facilities; Associated alkali recovery workshop (including waste heat power generation system for alkali furnaces) ; Preparation of supporting chemicals such as chlorine dioxide, hydrogen peroxide, and polyaluminum chloride ; Associated water intake facilities, pollution control systems, white clay recovery, and other auxiliary facilities ; The general layout works for the project’s supporting facilities. Progress milestone: December 26, 2025 – Public consultation on the social stability risk assessment for the Guangxi Taisheng Green Fiber full-industry chain base project (Stability Assessment Announcement)
Reply #22025-12-29
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-30
【Ten Years of Rapid Development in Chemical Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #42025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first large-scale floating platform made of basaltic steel for deep-sea aquaculture was launched in 2025: 2937-2025 https://bbs.hcbbs.com/thread-5709754-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-31
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #82025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-31
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #102025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 30-megawatt-class pure hydrogen gas turbine put into operation from 2025 to 2940 https://bbs.hcbbs.com/thread-5709894-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #112025-12-31
【Ten Years of Rapid Development in Chemical Equipment】Pilot-scale success achieved for the 2941-2025 high-temperature pure-oxygen pressurized bubbling fluidized-bed biomass gasification technology unit (referred to as the “Contes furnace”) https://bbs.hcbbs.com/thread-5709917-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.