Thread Content
Recently, the substation for the plant’s incineration system in the Fujian Zhongsha Gulei ethylene project, which was under the general contract of China National Chemical Corporation Tianchen, successfully received power for the first time, with the intermediate handover of the substation being completed at the same time. This marks a significant advancement in the incineration system project, laying a solid foundation for subsequent unit testing and system commissioning. As a key environmental protection facility for the Sino-Saudi Ghulayyil Ethylene Project, the plant’s incineration system is responsible for the harmless treatment of waste gas, waste liquid, and waste solids – the so-called \"three types of waste\". The substation serves as the \"power heart\" of this system; its successful connection to the power supply ensures a stable power supply for key process equipment such as incinerators and flue gas purification systems. It represents a decisive step in transitioning the project from installation and construction to full-scale commissioning. The achievement of the goal of \"completion upon power receipt\" once again highlights the efficient execution capabilities and professional collaborative skills of Tianchen Company’s project team. During the power reception process, the project team strictly followed the operating procedures, sequentially completing a series of key steps such as the impulse test on the incoming cable, power supply to the busbars, and the commissioning of the transformer. Monitoring shows that the power supply system is operating smoothly, with all technical parameters meeting the design standards; the power reception was a complete success. Next, the project team will continue to uphold the corporate spirit of \"integrity, responsibility, innovation, and perseverance,\" focus on the ultimate delivery goal, and make every effort to advance the subsequent work, ensuring that the project is completed with high quality. In this way, Tianchen will contribute to facilitating the deeper integration between China and Saudi Arabia in implementing the Belt and Road Initiative and Saudi Arabia’s 2030 Vision.
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling TeTu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs Achieved from 2935 to 2025! The first phase of pipeline laying for China’s largest offshore pipeline project has been successfully completed. https://bbs.hcbbs.com/thread-5709667-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first large-scale floating platform made of basaltic steel for deep-sea aquaculture was launched in 2025: https://bbs.hcbbs.com/thread-5709754-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Chemical Technology Documentation】Analysis of the Causes of Overtemperature in the Air Preheating Coils of a Shift Converter Process and Corresponding Countermeasures https://bbs.hcbbs.com/thread-5709677-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 30-megawatt-class pure hydrogen gas turbine put into operation from 2025 to 2940 https://bbs.hcbbs.com/thread-5709894-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Pilot-scale success achieved for the 2941-2025 high-temperature pure-oxygen pressurized bubbling fluidized-bed biomass gasification technology unit (referred to as the “Contess furnace”) https://bbs.hcbbs.com/thread-5709917-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first fully domestically produced 300-megawatt-class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first large-scale perovskite building-integrated photovoltaic demonstration project was officially connected to the power grid from 2929 to 2025. https://bbs.hcbbs.com/thread-5709550-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))