Hailianfeng Gas Co., Ltd. won the bid for Jinhong Gas’ BOG helium extraction and helium liquefaction project

2026-03-16View Original

Thread Content

Recently, Shanghai Lianfeng Gas Co., Ltd. won the bid for the BOG helium extraction and helium liquefaction project of Jinhong Gas Co., Ltd. (stock code: 688106), and will supply it with a complete set of equipment for the extraction and liquefaction of helium-rich natural gas liquefaction non-condensable gases (BOG). In light of the project’s characteristics of tight deadlines, high standards, and strict requirements, Shanghai Lianfeng has assembled a core technical team to advance work on preliminary design, equipment manufacturing, and project construction. As a strategic and scarce resource used in fields such as aerospace, semiconductor manufacturing, and medical magnetic resonance imaging (MRI), China has long faced difficulties due to a shortage of this resource. The helium content in natural gas is generally below 0.05%, which is far lower than the 7.5% level found in some gas fields in the United States; therefore, traditional methods for extracting helium are highly uneconomical. Shanghai Lianfeng has innovatively adopted BOG helium extraction technology, focusing on the flash gas generated during the LNG production process. In the LNG cryogenic liquefaction process, helium, which has an extremely low boiling point, cannot be liquefied; as a result, it naturally accumulates in the BOG, creating conditions for its extraction. This project employs a combined process of cryogenic cooling + low-temperature adsorption + ultra-low-temperature expansion to enable the equipment to operate across extreme temperature ranges from 20°C to -269°C, raising the technical level of domestic helium extraction and liquefaction equipment to a new height.
Reply #22026-03-16
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-03-16
【Common Issues in Haichuan Pipeline Design】--Calculation of Fluid Conveyance Pipelines https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715465 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42026-03-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-03-17
【3D Process Flow】Summary Post--Two-Phase Extraction https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715799 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #62026-03-17
【3D Process Flow】Summary Post--Two-Phase Extraction https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715799 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72026-03-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-03-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2034 to 2026: Beijing Aerospace Power Research Institute’s first large-scale TO+RTO combustion unit designed independently began operating at full capacity successfully. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-03-22
【Special Topic on Safety Facility Design】Discussion Summary Post: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714902 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #102026-03-23
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #112026-03-24
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial plant for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process was put into commission at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.