Thread Content
On January 5, 2026, bathed in the warm winter sun during the Minor Cold season, on the beautiful Donghai Island in Zhanjiang, the largest tower of the aromatics extraction unit at Sinochem Refining and Chemicals – the extraction distillation tower T-401 – was successfully installed. At the same time, the lights were turned on in this tower, marking a successful start to the new year for this BEPC turnkey project undertaken by Guangzhou Engineering Company. The tower is 73 meters tall and 3 meters in diameter, with a lifting capacity of 210 tons. Its installation was carried out using a \"double-crane lifting\" method, with a 650-ton crawler crane used for the main lifting and a 260-ton crawler crane for assisting with the lift. At 12:37 p.m., at the command of the crane operator, the two cranes began to exert force slowly, and the tower rose steadily. After nearly an hour of precise maneuvering, accurate alignment was achieved at 13:35 between the bolt holes in the tower’s skirt base and the foundation anchor bolts; the entire process was carried out safely and under control, with successful positioning on the first attempt, thereby demonstrating the project team’s professional organization skills and efficient execution capabilities in handling large-scale lifting operations. The successful completion of this lifting operation not only creates essential working space for the subsequent installation of steel structures and pipelines, but also marks the full entry of the project into an accelerated phase of equipment installation, laying a solid foundation for the overall progress of construction by 2026.
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really great! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really great! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】Sinopec’s fluidized-bed residue hydrogenation technology was applied for the first time in a million-ton-scale industrial plant from 2025 to 2957. https://bbs.hcbbs.com/thread-5710591-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】2958-2025: Maoming Petrochemical becomes the first company in China’s petrochemical industry to have its extruders monitored in real time; the project was approved successfully. https://bbs.hcbbs.com/thread-5710592-1-1.html (Source: Hachuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】2959-2026**Successful development of technology for keeping natural gas compressors operating without power interruption in pipeline systems https://bbs.hcbbs.com/thread-5710632-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The first phase of the Jinchuan Nickel-Cobalt Heavy Metal High-Salinity Wastewater Zero-Discharge Treatment Project goes into operation https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))