HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The lifting task of the gasifier for Jiangsu JinKong Equipment XinHengSheng Chemical’s 400,000-ton synthetic ammonia and 600,000-ton urea production project was completed successfully

2023-05-05View Original

Thread Content

The lifting of the gasifier, a key piece of equipment in the gasification unit for Jiangsu JinKong Equipment Xinhengsheng Chemical’s project to produce 400,000 tons of synthetic ammonia and 600,000 tons of urea per year, was successfully completed. Author/Source: Huahua Network – Coal Chemical Industry. Date: April 28, 2023. Clicks: 251. On April 25, the lifting of the gasifier, the core equipment in the gasification unit for this upgrade project, was successfully completed. At 15:30 on April 25, with the gasification section of the second gasifier successfully connected, both gasifiers in the gasification unit of the 40·60 project at Xin Hengsheng Company, constructed by Sinochem Third Construction, were safely and successfully hoisted into place. The gasifier is the core equipment of the gasification unit; it employs the domestically developed MaWei furnace technology – a \"powder coal gasification + radiant waste boiler + water washing\" gasification method – and is capable of producing 180,000 Nm3 of usable gas per hour. Designed by Guizhou Aerospace Maiwei Technology Co., Ltd. and manufactured by Harbin Boiler Factory Co., Ltd. The furnace is approximately 36 meters in length and 4.2 meters in diameter, and is designed in two sections: the gasification section weighs 160 T, while the waste pot section weighs 355 T. The installation elevation of the equipment supports is +40.0 meters. For lifting, a 1600T crawler crane is used as the main crane, with a 400T crawler crane used to assist in the lifting operation. The successful completion of this lifting task has laid a solid foundation for the subsequent installation of equipment and pipelines. The total investment for New Hengsheng Company’s 40.60 project is 4.97 billion yuan; the project is located in the Suhua area of the Economic Development Zone in Xinyi City, Jiangsu Province. In the first phase of the project, Shaohang Maiwei gasification furnaces and a fluidized bed pressurized continuous gasification process are used, enabling an annual production capacity of 400,000 tons of synthetic ammonia, 600,000 tons of urea, and 33,800 tons of concentrated sulfuric acid.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.