The environmental impact report (form) for the project of New Nanshan Chemical (Lijin) Co., Ltd. to produce 110,000 tons per year of high-end nylon new materials has been approved

2025-09-01View Original

Thread Content

It was recently reported that the environmental impact assessment report (form) for New Nanshan Chemical (Lijin) Co., Ltd.’s project to produce 110,000 tons per year of high-end nylon materials has been approved. Project Overview: Project Name: New Nanshan Chemical (Lijin) Co., Ltd.’s Annual Production of 110,000 Tons of High-End Nylon New Materials Project. Developer: New Nanshan Chemical (Lijin) Co., Ltd. Location: Within the Chemical Industry Park in Lijin Binhai New Area, Dongying City, Shandong Province – to the north of Yinhai Fifth Road, to the south of Yinhai Sixth Road, to the east of Diding Road, and to the west of Jinhe First Road. Project nature: New construction. Construction contents: The new construction mainly includes 1 set of salt production facility with an annual capacity of 60,000 tons, 1 set of facility for producing new nylon 66 materials with an annual capacity of 40,000 tons, 1 set of facility for producing new nylon 6 materials with an annual capacity of 70,000 tons, along with the accompanying auxiliary facilities.
Reply #22025-09-01
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, the technology for producing high-oxygen-resistant enamel steel will reach international leadership levels. https://bbs.hcbbs.com/thread-5700345-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-09-02
【History of Haichuan Chemical】The crude oil pretreatment and catalytic cracking units at Yangzhou Petrochemical, which had been in operation for 32 years, were officially shut down and dismantled https://bbs.hcbbs.com/thread-5700372-1-1.html (Source: Haichuan Chemical Forum)
Reply #42025-09-03
【Ten Years of Rapid Development in Chemical Equipment】2647-2025: Zhejiang Zhongkong’s world’s first large-scale temporal model for the process industry is now available for use. https://bbs.hcbbs.com/thread-5700490-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-09-03
【Ten Years of Rapid Development in Chemical Equipment】2647-2025: Zhejiang Zhongkong’s world’s first large-scale temporal model for the process industry is now available for use. https://bbs.hcbbs.com/thread-5700490-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-09-03
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first set of static bulk crystallizers for the production of chemical raw materials used in aramid products was successfully installed between 2026 and 2025. https://bbs.hcbbs.com/thread-5700494-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-09-04
【HaiChuan Equipment Guessing Game】It looks like a large steel stamp; those who guess correctly will receive rewards. https://bbs.hcbbs.com/thread-5700561-1-1.html (Source: HaiChuan Chemical Forum)
Reply #82025-09-05
【Ten Years of Rapid Development in Chemical Processing Equipment】2652-2025: Major breakthroughs achieved in the application of methanol new energy pipeline transportation technology in complex terrains in China https://bbs.hcbbs.com/thread-5700596-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-09-05
【Ten Years of Rapid Development in Chemical Engineering Equipment】2653–2025: Completion of the First Pipeline Laying in China’s Largest Middle East Pipeline Project to Date https://bbs.hcbbs.com/thread-5700633-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-09-05
【Ten Years of Rapid Development in Chemical Engineering Equipment】2653–2025: Completion of the First Pipeline Laying in China’s Largest Middle East Pipeline Project to Date https://bbs.hcbbs.com/thread-5700633-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-09-06
【Ten Years of Rapid Development in Chemical Equipment】2654–2025: China’s photovoltaic industry says goodbye to extremely expensive imported films; Shenghong Petrochemical’s 100,000 tons per year polyolefin elastomer production facility goes into operation https://bbs.hcbbs.com/thread-5700638-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.