The lower section of the H2S concentration tower, which is part of the first phase of the project for producing 800,000 tons of butyl octanol per year at Hebei HNA Petrochemical, has been accurately lifted into place

2026-01-09View Original

Thread Content

On January 8, good news came from the construction site of the Hebei HNA Petrochemical project, whose annual production capacity is 800,000 tons of butyl octanol, and which is being built by the Fourth Engineering Company of China National Chemical 14th Construction Corporation. The lower section of the H2S concentration tower, one of the tower equipment components, was successfully lifted into place with precision, marking the full entry of the project construction into the critical phase of equipment installation. It is reported that the lower section of the H2S concentration tower being lifted this time is a core piece of equipment for the project, making the lifting process difficult and requiring high technical expertise. The tower section is 35.6 meters long, with a total lifting weight of around 140 tons; it needs to be lifted over an existing frame structure, and the maximum lifting height reaches 70 meters. To ensure the safe and efficient completion of the lifting operation, the project team evaluated various plans on multiple occasions; ultimately, a collaborative approach was adopted, using a 750-ton crawler crane as the main lifting device and a 500-ton truck crane as an auxiliary one, thereby ensuring adequate safety margins for the lifting process.
Reply #22026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The Phase I project for zero discharge treatment of high-salinity wastewater containing heavy metals from Jinchuan Nickel-Cobalt Plant is now in operation. https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: HCBBS Chemical Forum)
Reply #32026-01-10
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really great! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-01-10
【Ten Years of Rapid Development in Chemical Equipment】2962-2025: Tianyuan Company’s first domestic lignite carbonization experimental unit in Shenmu coal chemical industry has been successfully put into operation https://bbs.hcbbs.com/thread-5710802-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-01-10
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-01-11
【Ten Years of Rapid Development in Chemical Equipment】The bulk-phase ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-11
【Ten Years of Rapid Development in Chemical Equipment】The bulk-phase ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-01-12
【Ten Years of Rapid Development in Chemical Equipment】Yanhua Chemical’s new technology for \"building five new methanol distillation towers\" from 2025 to 2026 has passed **level of appraisal** https://bbs.hcbbs.com/thread-5710884-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #102026-01-13
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluation from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #112026-01-13
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluation from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.