HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Filing for the hydrogen production phase of the Longji Ulaanqab Rear Banner integrated wind and solar hydrogen production project (Development and Reform Department) – project registration

2026-01-10View Original

Thread Content

On January 8, information available on the Online Approval Service Hall for Investment Projects in Inner Mongolia Autonomous Region showed that the industrial project registration (for development and reform purposes) related to the hydrogen production phase of the Longji Ulaat Khorgo Wind-Solar Hydrogen Production Integrated Project, submitted by Longfu New Energy Technology Co., Ltd. in Ulaat Khorgo Banner, met the industry policies and market access standards, and thus was approved for registration. Project Code: 2601-150825-04-01-908611
Project Owner: Longfu New Energy Technology Co., Ltd., Houhuo Banner
Construction Location: Bayannur City – Houhuo Banner – Qingshan Industrial Park, south of Wei San Road, north of Wei Si Road, west of Jing Liu Road
Total Investment: 1,880,780,000 yuan, of which 564,230,000 yuan comes from own funds, 1,316,550,000 yuan is to be obtained through bank loans, and 0 yuan from other sources.
Planned Construction Period: August 2026 to December 2027
Construction Scale and Scope: This project involves the construction of an alkaline water electrolysis plant capable of producing 37,100 tons of hydrogen per year. The electricity required for operation will come from local renewable energy power plants, and the hydrogen produced will be transported via pipelines to a nearby project that uses biomass to produce green methanol. A new hydrogen production workshop has been built within the factory complex ; One 220KV substation, one circulating water station, as well as auxiliary facilities such as a central control room, a general warehouse, and office buildings. On August 20–21, 2025, the People’s Government of Wulat Houqi and Longi Green Energy Technology Co., Ltd. signed a project investment cooperation agreement. In accordance with the project agreement, LONGi Green Energy’s integrated project in Ulaat Khongor Banner for the annual production of 400,000 tons of green methanol via wind, solar, hydrogen, and storage technologies. A 1.05 GW wind and solar power generation project is planned, with an annual production of 54,000 tons of green hydrogen; this hydrogen will be used directly to produce 400,000 tons of green methanol per year. On September 11, 2025, Longi Green Energy Technology Co., Ltd.’s green methanol project in Wulat Houqi was approved for implementation; the first phase of this project will have an annual production capacity of 190,000 tons of green methanol.
Reply #22026-01-11
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32026-01-11
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-01-11
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52026-01-13
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluations from 2026 to 2966. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-01-13
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluations from 2026 to 2966. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-01-14
【Ten Years of Rapid Development in Chemical Equipment】The Tianjin Bohua Safety Organic Liquid Hydrogen Storage and Deployment Demonstration Project, 2970–2025, has been successfully put into operation. https://bbs.hcbbs.com/thread-5711046-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-01-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first pressure relief device for flow meters in sulfur-containing gas fields in China was put into use from 2027 to 2026. https://bbs.hcbbs.com/thread-5711107-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-01-17
【Ten Years of Rapid Development in Chemical Processing Equipment】The first 1,500-meter-class vertical pipeline underwater connector with metal sealing has been certified: 2972-2026 https://bbs.hcbbs.com/thread-5711122-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-01-17
【Ten Years of Rapid Development in Chemical Equipment】The first domestically produced helium ionization chromatograph, model 2973-2025, has been officially delivered to the high-end polyolefin project at Blue Sea New Materials. https://bbs.hcbbs.com/thread-5711129-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #112026-01-19
【Ten Years of Rapid Development in Chemical Equipment】Sinopec’s POE plant in the Tianjin Nangang Ethylene Project features a 100% domestically produced DCS system; it has been put into operation. https://bbs.hcbbs.com/thread-5711441-1-1.html (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.