Thread Content
In 2026, during the 25th National “Safety Production Month”, everyone is encouraged to prioritize safety and be capable of responding to emergencies; efforts are also being made to identify and rectify potential risks and hazards. -------------------------------------------------- On June 30, the first piece of rotating equipment for the 100,000-ton/year tubular EVA plant under Jilin Petrochemical Company’s refining and chemical industry transformation project was hoisted into place by the Jilin Petrochemical EVA Project Department of the First Branch Company. This marks the official commencement of the equipment installation phase for this plant. The equipment being lifted this time is the vinyl acetate injection pump, which is a key piece of equipment in the low-pressure recycle gas treatment unit of the facility. The equipment measures 6.2 meters in length, 3 meters in width, and 3.2 meters in height, with a total weight of 12 tons. To ensure the safe and efficient completion of the first lifting operation, the project team planned in advance and made thorough arrangements, drafting a specialized lifting plan. It verified each key aspect, including crane selection, rigging setup, site foundation treatment, and safety measures. Before the lifting operation, the project management team organized all workers to conduct a safety technical briefing, detailing job responsibilities and ensuring that operational duties were clearly defined. At 9 a.m., upon receiving the lifting command from the on-site commander, the lifting equipment smoothly hoisted, rotated, and positioned itself. Throughout the process, instructions were clear, operations were conducted in accordance with standards, and all procedures were seamlessly coordinated. In just 18 minutes, the equipment was safely placed onto its foundation, with all anchor bolts being correctly installed on the first attempt. The owners and persons in charge of the supervision unit observed the process on site throughout; they commended the project department for its efficient organizational capabilities in construction and its professional, standardized construction standards. Moving forward, all personnel involved in the project will take this successful first lift as an opportunity to strictly adhere to safety control standards and ensure superior project quality. They will make the most of the current optimal construction period, work diligently under increased pressure, and strive to meet all scheduled milestones, thereby delivering a high-quality project to the client.
【Ten Years of Great Development in Chemical Equipment】 From 3182 to 2026: A disruptive restructuring. The industry’s first intelligent upgrade project for the mechanical equipment of a 5.5-meter sized coke oven https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725339 (Source: Haichuan Chemical Forum (HCBBS))
[3D Process Flow] Compilation post – useful for learning and understanding the process flow https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
【Ten Years of Great Development in Chemical Equipment】3183-2026: The first large-scale phenol extraction project from coal tar in China – the 100,000-ton/year green phenol extraction project from coal tar undertaken by Xinjiang Xuanli has been completed. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725540 (Source: Haichuan Chemical Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Lack of Reliable Fixing Supports Under Suspended Platforms https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725606 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))