The desulfurization tower shell for the Hexie New Energy Lanzhou Clean and Smart Heat Source Project was successfully lifted into place

2026-01-19View Original

Thread Content

Recently, the desulfurization tower shell for the Hehai New Energy Lanzhou Clean and Smart Heat Source project was successfully lifted and placed precisely in the designated area, laying a solid foundation for the subsequent full installation of environmental protection equipment. This project is a key measure for Lanzhou City to advance the clean and intelligent upgrading of its heating systems, and it holds great significance for improving the level of the city’s infrastructure. The desulfurization tower shell to be lifted this time is massive, with a total length of 26 meters, a diameter of 4.4 meters, and a weight of 34 tons; it was lifted in segments. The 50-square-meter work area at the project site is located adjacent to the boiler frame and the heat pump room, which imposes extremely high demands on the precision and safety of lifting operations. To overcome this challenge, the project team adopted a construction method of \"prefabrication on the ground and installation in the air\", carrying out key processes such as welding of the cylinder body and pre-assembly of components on the ground first, thereby reducing the need for work at heights ; During the lifting process, the team deployed a 130-ton truck crane and simultaneously employed an innovative \"ground-to-air\" relay method; through precise scheduling, it was successfully possible to quickly adjust the orientation of the cylinder by 90 degrees in the air. After hours of careful operation, the cylinder was finally placed in position steadily, with the error kept to an extremely low level. Compared to traditional methods of lifting individual components, this innovative construction approach offers significant advantages: on-site work is reduced by 60%, and the construction time is shortened by 40%. This effectively reduces various risks associated with construction in winter, achieving a balance between efficiency and safety. The successful lifting of the desulfurization tower shell not only demonstrates the company’s team’s strong professional skills and efficient project management capabilities, but also illustrates vividly the perfect integration of precision and efficiency in modern engineering construction. Next, the project team will use this as an opportunity to steadily advance the subsequent construction work, aiming to create a model project for clean and intelligent heating systems.
Reply #22026-01-19
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035: The first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, has been successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-01-19
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035: The first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, has been successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-01-19
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035: The first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, has been successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-01-20
【Ten Years of Rapid Development in Chemical Equipment】2978–2026: China’s First “Lighthouse Factory” in the Global Fiber Industry Established by Huafeng Chongqing Spandex https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-01-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-01-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-01-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-01-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-01-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.