At 7 p.m. on January 27, at the construction site of Maoming Petrochemical’s No. 2 aromatic extraction unit, the C202 toluene tower (φ2700×46065 mm, lifting weight of 120 tons) was accurately placed in position with the assistance of a 400-ton crawler crane and a 600-ton truck crane, marking a significant milestone in the installation of the unit’s core equipment.
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The first domestically produced helium ionization chromatograph, model 2973-2025, has been officially delivered to the high-end polyolefin project at Blue Ocean New Materials. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711129 (Source: Haichuan Chemical Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Inconsistent installation directions of pipeline bolts and excessive exposed length of the bolts https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711719 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The Tianjin Bohua Safety Organic Liquid Hydrogen Storage and Deployment Demonstration Project, 2970–2025, has been successfully put into operation. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711046 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711847 (Source: Haichuan Chemical Industry Forum (HCBBS))