HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Wutongqiao, Leshan, Sichuan: Project for the relocation and construction of a facility capable of producing 50,000 tons per year of rare earth catalytic new materials

2025-07-13View Original

Thread Content

Project Name: Project for the relocation and construction of a facility capable of producing 50,000 tons per year of rare earth catalytic new materials. Launch date: June 23, 2025. Location: Sichuan Province. Industry/Project Type: Chemicals and pharmaceuticals/Chemical raw materials and chemicals. Project owner: Runhe Catalyst Co., Ltd. Total investment amount: 1,000,000 million yuan. Current progress: The project is under registration. Construction location: Wutongqiao Chemical Industrial Park, Leshan City, Sichuan Province. Scope of construction: Relocation and construction of a production line for rare earth catalytic new materials with an annual output of 50,000 tons, along with related facilities. This includes building a production line for rare earth catalytic cracking catalysts with an annual capacity of 30,000 tons, a production line for methanol-to-olefins catalysts with an annual capacity of 17,300 tons, and a production line for functional molecular sieves with an annual capacity of 2,700 tons (200 tons/year of TS-1 molecular sieve, 500 tons/year of Beta molecular sieve, 2,000 tons/year of SAPO-34 molecular sieve). Phase 1 will involve the construction of the 30,000-ton/year rare earth catalytic cracking catalyst production line; Phase 2 will cover the construction of the 2,700-ton/year functional molecular sieve production line; and Phase 3 will involve the construction of the 17,300-ton/year methanol-to-olefins catalyst production line. The project covers an area of approximately 150 mu, with a building area of around 110,000 square meters. It mainly includes various types of buildings such as raw material warehouses, molecular sieve production workshops, catalyst production workshops, finished product warehouses, as well as R&D centers and analysis laboratories. The main production equipment includes crystallization tanks, exchange tanks, filters, flash dryers, roasting furnaces, gelation kettles, and spray dryers. Progress milestone: June 20, 2025. The project was registered in April 2025. (Project registration) Launch date: June 23, 2025 Region: Sichuan Industry/project type: Chemicals and pharmaceuticals/chemical raw materials and chemicals Project owner: Runhe Catalyst Co., Ltd. Total investment: 1,000 million yuan Current status: Project registration Location of construction: Wutongqiao Chemical Industrial Park, Leshan City, Sichuan Province Scope of construction: Relocation and construction of a production line for rare earth catalytic new materials with an annual output of 50,000 tons, along with supporting facilities. This includes building a production line for rare earth catalytic cracking catalysts with an annual output of 30,000 tons, a production line for methanol-to-olefins catalysts with an annual output of 17,300 tons, and a production line for functional molecular sieves with an annual output of 2,700 tons (200 tons/year of TS-1 molecular sieve, 500 tons/year of Beta molecular sieve, 2,000 tons/year of SAPO-34 molecular sieve). Phase 1 will involve the construction of the 30,000-ton/year rare earth catalytic cracking catalyst production line; Phase 2 will cover the 2,700-ton/year functional molecular sieve production line; and Phase 3 will focus on the 17,300-ton/year methanol-to-olefins catalyst production line. The project covers an area of approximately 150 mu, with a building area of around 110,000 square meters. It mainly includes various types of buildings such as raw material warehouses, molecular sieve production workshops, catalyst production workshops, finished product warehouses, as well as R&D centers and analysis laboratories. The main production equipment includes crystallization tanks, exchange tanks, filters, flash dryers, roasting furnaces, gelation kettles, and spray dryers. Progress milestone: June 20, 2025. The project was registered in April 2025. (Project Filing)
Reply #22025-07-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】The mixed aromatic hydrocarbon conversion catalyst project at the Liaoyang Petrochemical Research Institute has completed full-scale industrial testing and verification. https://bbs.hcbbs.com/thread-5696754-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-07-14
Summer is here – will your company offer after-school care programs? ? ? https://bbs.hcbbs.com/thread-5696774-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-07-15
【Frontiers of HaiChuan Chemical Technology】Construction begins on Hunan Petrochemical’s biomass fluidized bed and gas flow bed flexible platforms https://bbs.hcbbs.com/thread-5696841-1-1.html (Source: HaiChuan Chemical Forum)
Reply #52025-07-16
Like! Can flying a kite also generate electricity? China overcomes the technical barriers to high-altitude wind power generation! https://bbs.hcbbs.com/thread-5696862-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-07-18
【Ten Years of Rapid Development in Chemical Processing Equipment】2545–2025: China’s first highly integrated mine water treatment project produces high-quality crystalline salts https://bbs.hcbbs.com/thread-5697038-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-07-20
【Haichuan Teahouse】Gansu Province cuisine----Stewed Dishes https://bbs.hcbbs.com/thread-5697091-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-07-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】2547-2025: Shangguo’s Taonan Wind Power-Biomass Integrated Green Methanol Production Demonstration Project – 2000 m³ Medium-Pressure Hydrogen Spherical Storage Tank https://bbs.hcbbs.com/thread-5697145-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-07-21
【History of Haichuan Chemical】China’s first specialized gas production plant for helium extraction from natural gas – Weiyuan Natural Gas Purification Plant https://bbs.hcbbs.com/thread-5697181-1-1.html (Source: Haichuan Chemical Forum)
Reply #102025-07-22
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2549 to 2025! The four-seater electric-electric hybrid aircraft prototype powered by hydrogen fuel cells made its successful maiden flight in Shenyang. https://bbs.hcbbs.com/thread-5697256-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-07-22
【History of Haichuan Chemical】Looking at China’s sulfuric acid industry’s birthplace, Nanhua, through a sales order https://bbs.hcbbs.com/thread-5697276-1-1.html (Source: Haichuan Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.