HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Tender for detailed site survey for the ground preparation phase of Sinopec Great Wall Energy’s 800,000-ton coal-to-olefins upgrade demonstration project

2026-02-05View Original

Thread Content

Recently, Meihua Ke learned that Sinopec Great Wall Energy Chemical (Inner Mongolia) Co., Ltd. has issued a tender for the detailed survey work related to site leveling for its 800,000-ton-per-year coal-to-olefins upgrade demonstration project in Dalu. The scope of this tender includes detailed geological surveys of the slope stabilization works involved in the site leveling project (covering an area of approximately 165.40 hectares; the required geological survey standard is Class A), surveying of the slopes within that area using Grade IV GNSS control points, as well as related technical services such as the digitization of the collected data. The planned duration for this work is 251 days, and the estimated contract value for this phase is 3.4 million yuan (excluding taxes). Detailed geological survey for the slope stabilization work in Section 2 of the site grading project: Planned duration: 251 days. Estimated contract value for this section: 4.3 million yuan (excluding taxes). Scope of the bidding for this section: Detailed geological surveys of the slope stabilization works in the area to the east of the site designated for the 800,000 tons/year coal-to-olefins upgrading demonstration project (survey area of approximately 16,554 hectares; geological survey grade: Class A). This includes comprehensive engineering surveys across the entire site during the site grading and detailed survey phases (excluding slope surveys in the area to the west of the site); control surveys (measurement using GNSS control points of fourth order), topographic surveys at scales of 1:1000 and 1:500), detection of underground facilities, construction layout work, as well as related technical services such as the digitization and storage of data.
Reply #22026-02-05
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32026-02-05
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42026-02-06
The 【Haichuan Equipment Guessing】 series will continue to be updated in 2027 – all Haichuan fans are welcome to participate actively! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=2079686 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-02-06
Most of the projects utilize Sinopec’s own technologies: the gasification process makes use of the Dongfang furnace (SE furnace), while the MTO process employs SMTO technology.
Reply #62026-02-07
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial demonstration plant for high-pressure methane-carbon dioxide dry reforming was successfully put into operation from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712818 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-02-08
【Ten Years of Rapid Development in Chemical Equipment】The first of its kind within the refining and chemical processing sector, ZHLI Company’s 1-million-ton-per-year closed-system waste gas treatment project for delayed coking, was successfully completed and accepted in terms of mechanical requirements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713019 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-02-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2026, the large-scale low-temperature refrigeration systems produced by Zhongke Fuhai will help accelerate the development of the IP-SAFE project for scientific and educational infrastructure. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713024 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-02-10
【Ten Years of Rapid Development in Chemical Equipment】China’s first gigawatt-class AEM film production line went into mass production from 2030 to 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713037 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #102026-02-10
【Haichuan Spring Festival Tea House】Old items seen when returning to one’s hometown – do you recognize them? (41)--For three meals a day https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713456 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #112026-02-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The comprehensive set of technologies for producing magnesium-based solid hydrogen storage materials with independent intellectual property rights in China has passed the evaluation process. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713092 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.