Zhongsha Gulei 1.5 million tons/year ethylene project: The main units have fully entered the installation phase

2026-03-01View Original

Thread Content

Sino-Saudi Ghulayyeh 1.5 million tons/year ethylene project: Main units have entered the installation phase 2026-02-27 14:09:29 With a total investment of 42.07 billion yuan and a planned ethylene cracking capacity of 1.5 million tons per year, the Sino-Saudi Ghulayyeh petrochemical integration project has now seen its main units enter the installation phase, resulting in an accelerated pace of construction. As an important project for realizing energy and chemical cooperation between China and Saudi Arabia, the advancement of this project holds great significance for the development of the petrochemical industry belt along Fujian’s coast. The project is jointly developed by Fujian Energy & Petrochemical Group (holding 49% of the shares) and Saudi Industrial Investment Company, a wholly-owned subsidiary of SABIC (holding 51% of the shares). It is one of the key cooperation projects between China and Saudi Arabia in the field of energy and chemicals. This cooperation model not only reflects the deep integration of international capital and local resources, but also signifies a further deepening of the internationalization strategy of the Gulei Petrochemical Complex. In terms of plant configuration, the project is centered around a 1.5 million tons per year ethylene cracking unit, with key units such as EO reactors, product recovery towers, reboilers, polyethylene/polypropylene plants, and propylene oxide plants built as supporting facilities. It also includes core equipment such as large-scale compressors, heat exchangers, towers, storage tanks, environmental protection treatment devices, and intelligent control systems; the overall process system is complete, with a high level of automation. Around the ethylene core platform, high-value-added facilities are planned to be constructed downstream, including ones for producing 100,000/1 million tons per year of ethylene oxide/ethylene glycol, 400,000 tons per year of HDPE, 600,000 tons per year of mLLDPE/HDPE, 50,000 tons per year of hexene-1, 950,000 tons per year of polypropylene, 250,000/150,000 tons per year of phenol acetone, 270,000 tons per year of bisphenol A, and 290,000 tons per year of polycarbonate. At the same time, facilities for the hydrogenation of 910,000 tons per year of pyrolysis gasoline, butadiene extraction at 220,000 tons per year, butene-1 production at 56,000 tons per year, and aromatic extraction at 570,000 tons per year will be built as well, thus creating a complete industrial chain that spans from ethylene pyrolysis to the production of high-end new materials. As a key project set to come online in 2026, it will not only enhance the raw material supply capacity of Fujian’s coastal petrochemical industry belt but also improve the availability of high-end chemical materials in the region. With the implementation of this project, the strategic importance of the Gulei Petrochemical Complex within China’s and even the world’s petrochemical industry is set to increase further.
Reply #22026-03-01
【Ten Years of Rapid Development in Chemical Equipment】The pilot-scale project at Shaanxi Coal Research Institute for producing polyethylene wax via the ethylene synthesis method, with a capacity of 100 tons, succeeded in its first trial run with batch feeding. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714307 (Source: Hachuan Chemical Industry Forum (Hchuanliu hcbbs))
Reply #32026-03-01
Green methanol industry: Electrolytic methanol production is the key approach for scaling up production; Inner Mongolia and the Northeast region lead in this field. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714326 (Source: HCBBS Chemical Forum)
Reply #42026-03-01
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52026-03-01
【Illustrated Code for the Layout Design of Petrochemical Plants SH/T 3011-2011】Collection https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714376 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #62026-03-01
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-03-02
【Ten Years of Rapid Development in Chemical Equipment】The new electronic-grade isopropanol production project developed through independent R&D in China was put into operation between 2026 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714396 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-03-02
Haven’t seen it before, right! ! ! This is what a elbow subjected to prolonged liquid flow looks like! ! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714477 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-03-03
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Lack of splash protection devices on flanges in the alkali solution system https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714520 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102026-03-04
【Ten Years of Rapid Development in Chemical Equipment】3028-2026: Breaking Foreign Monopolies! Wanhua Chemical has built China’s first industrial production facility for high-refractive index PC https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714589 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #112026-03-05
【Ten Years of Rapid Development in Chemical Engineering Equipment】The heat transfer oil furnace with the highest load at the Beijing Aerospace Power Research Institute was successfully commissioned 3029-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714661 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.