HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Donghua Technology has officially signed an EPC general contract for the green ammonia phase of the first stage of the project aimed at producing 800,000 tons per year of integrated wind, solar, hydrogen, and ammonia-based products, with Regenerated Green Hydrogen Energy (Inner Mongolia) Co., Ltd

2026-03-10View Original

Thread Content

On the 6th of the month, Donghua Engineering Technology Co., Ltd. (referred to as “Donghua Technology”) issued a statement stating that the company has officially signed an EPC general contract for the green ammonia production phase of the first stage of the project aimed at producing 800,000 tons per year of hydrogen, ammonia, and other products using wind and solar energy, with Regenerated Green Hydrogen Energy (Inner Mongolia) Co., Ltd. This is a contract with a provisional estimate amount of 2.026 billion yuan, and the construction period is scheduled to conclude by June 18, 2028. According to the announcement, the value of the contracts signed this time accounts for 22.86% of Donghua Technology’s audited operating revenue for 2024, with an average annual contract value accounting for approximately 10.16%. The successful signing and execution of this contract are expected to further strengthen Donghua Technology’s engineering capabilities in the field of green energy chemicals, as well as enhance the company’s brand influence in the integrated services related to wind, solar, hydrogen, and energy storage. In terms of the project scope, this is Phase 1 of a project aimed at producing 800,000 tons of green ammonia per year, with the plant’s designed capacity being 200,000 tons of green ammonia per year. The construction scope includes the installation of new process production units, storage and transportation facilities, auxiliary equipment, utility systems, as well as living facilities in front of the plant. Currently, the project has completed the registration for investment approval in the Inner Mongolia Autonomous Region.
Reply #22026-03-10
The controlling shareholder of Renewable Energy is Yijing Xing Green Hydrogen Energy Investment (Hainan) Co., Ltd., while the actual controller is Renewable Green Hydrogen Energy Technology Asia Co., Ltd. The project has completed the registration process for investment projects in the Inner Mongolia Autonomous Region. As the entity responsible for the construction and operation of the project, the renewable energy sector possesses the capacity to fulfill its obligations under this project. Project content and scale: The first phase of the 800,000-ton green ammonia project, which includes the construction of new process production facilities, new storage and transportation systems, new auxiliary facilities, new utility systems, and new living facilities outside the factory ; The plant’s capacity is 200,000 tons of green ammonia per year. Scope of work: Our company undertakes the overall project management, covering preliminary consultation for the project, design, procurement, construction and installation work, testing and inspection, assistance with completion acceptance, operation support, engineering insurance during the construction period, handover, and guidance for commissioning and debugging. According to the filing documents dated April 24, 2025, the scale of the project’s construction is an annual production capacity of 120,000 tons of green hydrogen/800,000 tons of green ammonia. Built in two phases, with 400,000 tons per phase. In the first phase of the project, one set for air separation nitrogen production, one set for hydrogen purification, and seven hydrogen electrolysis plants will be built, including a total of 56 modular alkaline electrolyzers with a capacity of 2,000 cubic meters each. If the configuration of the second-phase project is the same as that of the first-phase project, the project will be equipped with 112 electrolyzers.
Reply #32026-03-10
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Station Water Outlet Height Less Than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-03-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】3033-2026: China’s first 10,000-ton-per-year demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-03-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】3033-2026: China’s first 10,000-ton-per-year demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-03-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】3037-2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-03-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-03-18
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-03-19
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 2039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.