HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

**Commissioning of gas-water separation unit for Energy Group’s 2 billion cubic meters per year coal-to-natural gas project in Zhundong

2026-03-11View Original

Thread Content

On March 10, the commissioning ceremony for the gas-water separation unit of **Energy Group’s 2 billion cubic meters per year coal-to-natural gas project in Zhundong was held in the Zhundong Economic and Technological Development Zone in Xinjiang. This project is a **demonstration project for the deep processing of coal industry, as well as a key construction project under Xinjiang’s 14th Five-Year Plan**, with a total investment of approximately 16.793 billion yuan. As a demonstration project for domestic integrated coal-to-natural gas technology, its key processes employ advanced domestic technologies and equipment, ensuring that the core technologies are under domestic control. The project includes plans for 1000MW of wind and solar power generation, 1GW of photovoltaic power used for hydrogen production, as well as CCUS technologies for carbon capture and oil enhancement via sequestration. This approach enables coordinated development of \"coal-to-gas production + green energy + carbon reduction,\" allowing for reduced energy consumption and carbon emissions while ensuring continued production. Upon completion, the project will enable an annual production of 1.833 billion cubic meters of natural gas, sufficient to meet the gas needs of 5.0228 million families of three members for one year, as well as 167 million cubic meters of liquefied natural gas. Leveraging Xinjiang’s abundant coal resources, the project will establish a modern coal-to-gas industry chain, injecting new momentum into regional economic development and providing important support for the transformation of the energy structure.
Reply #22026-03-11
【Ten Years of Rapid Development in Chemical Processing Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested in the Tarim Phase II ethylene project at Dushanzi Petrochemical https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32026-03-12
【Ten Years of Rapid Development in Chemical Equipment】3033–2026: China’s first 10,000-ton-per-year demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42026-03-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali industry, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-03-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali industry, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-03-16
【Haichuan Equipment Guessing Game】Wasps’ nests growing on pipes? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715340 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72026-03-16
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82026-03-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】3037-2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-03-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102026-03-21
【Ten Years of Rapid Development in Chemical Equipment】China’s Giant Fiber Production Line for Electronic Use, the Largest in the World, Launched 3041-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715973 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #112026-03-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first large-scale TO+RTO combustion unit independently designed by the Beijing Aerospace Power Research Institute has been operating at full capacity since 2034–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (Hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.