HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Chemical Equipment Powerful Power] 471-2022 Asia’s largest offshore oil platform completes floatover installation

2022-08-05View Original

Thread Content

This post was last edited by Swimming Fish in the Desert on 2022-8-5 10:43 Asia’s largest offshore oil platform completed floatover installation. On August 1, the 18,880-ton Enping 15-1 central platform topside module manufactured by Offshore Oil Engineering Co., Ltd. located in the Tianjin Port Free Trade Zone completed the overall floatover installation in the eastern waters of the South China Sea. my country’s design, construction and installation capabilities of ultra-large offshore oil and gas production facilities have reached the world’s advanced level.   The Enping 15-1 central platform consists of an upper module and a jacket. It is currently the heaviest and most equipped offshore oil production platform in Asia. The platform is the most important offshore facility in the Enping Oilfield Group Development Project. The project will build four new offshore drilling platforms and develop six new oil fields at the same time. After the first phase of production is put into operation in the second half of this year, the peak daily oil production will be nearly 5,000 tons. It is of great significance to further improve my country's energy security capabilities and achieve the "double carbon" goal.
Reply #22022-08-05
Accelerate the development of oil and gas in the South China Sea. Get our information back :lol
Reply #32022-08-05
The upper module of the Enping 15-1 central platform was completed at the Qingdao site in July this year. The construction period was 4.5 months shorter than that of modules of the same size. After towing for nearly 1,200 nautical miles, the "Big Mac" successfully reached the target sea area and entered the offshore installation process.
Reply #42022-08-05
Since the "tonnage" of "Big Mac" exceeds the capacity limit of global offshore floating cranes, the project team commissioned Asia's largest offshore barge "Haiyang Shiyou 229" to use floatover technology for offshore installation.
Reply #52022-08-05
Next, the Enping 15-1 central platform will enter the intense offshore joint adjustment stage. The Enping 15-1 oil field group in service will be put into operation for the first time in the second half of this year. The peak daily crude oil production will be nearly 5,000 tons. It will inject new impetus into the economic and social development of the Guangdong-Hong Kong-Macao Greater Bay Area. It is of great significance to further improve my country's energy security capabilities and achieve the goal of peak carbon neutrality.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.