HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The lifting of large-scale equipment for the ethylene plant at the CNOOC Shell Huizhou project was successfully completed

2026-03-20View Original

Thread Content

On March 16, the last piece of equipment for the ethylene plant at the CNOOC Shell Huizhou project – the off-gas distillation tower – was accurately installed in place. With this, the lifting of the large-scale equipment for the ethylene plant at the CNOOC Shell Huizhou project has been successfully completed, marking another milestone achievement in the project’s development. Since the project began, the shipping company has completed the transportation and lifting of 21 large-scale equipment units for the ethylene plant. Among these are the \"First Giant Tower\", an propylene distillation column with a weight of over 2,000 tons and a length of 110 meters, as well as the quench oil tower, which represents a real challenge in terms of weight; each one of them poses significant difficulties, and every lift involves a challenge.
Reply #22026-03-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2026, China’s first ultra-large-diameter (nominal diameter of 2000 millimeters) axial flow check valve successfully passed its practical application tests. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715995 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32026-03-24
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial facility for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process has entered the commissioning phase at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
Reply #42026-03-25
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: A period of 15 years! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into production. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-03-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】Key dehydrogenation technology for the toluene-methylcyclohexane organic liquid hydrogen storage system was approved for use, 3051–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716272 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-03-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful pilot testing of Dongfang Electric’s natural gas-ammonia combustion technology from 2032 to 2026! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716290 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.