The Hunan Petrochemical Biomass Gasification Flexible Platform project is on track to be completed by the end of April. According to Hunan Petrochemical, since work resumed on this project on March 4, 2026, the caprolactam production unit and the EPC contractor for the project, Sinopec Ningbo Engineering Company, have stepped up oversight of on-site operations as well as implemented measures to protect against rain during the rainy season, working towards the goal of completing the biomass gasification facility by April 30. Currently, the overall progress of the project is 95.37%, with a total of approximately 290,000 safe working hours achieved to date; over 130 workers are engaged in construction at the site on a daily basis. According to a report from Ningbo Engineering in December 2025, core equipment such as biomass gasification fluidized-bed gasifiers and POX converters has been installed. The core equipment of the project, namely the fluidized bed gasifier and the POX converter, were both manufactured independently by Ningbo Tianyi Manufacturing Company, which is part of Ningbo Engineering Company. The Hunan Petrochemical Biomass Gasification Flexible Platform project utilizes the pressurized circulating fluidized bed (SFBG) and gas-flow bed (SEBG) biomass gasification technologies independently developed by Sinopec. It involves the construction of a biomass gasification unit with a capacity of 100 tons per day using a gas-flow bed technology, as well as another unit with a capacity of 150 tons per day using a fluidized bed technology, thereby creating a flexible testing platform that supports experiments with multiple bed types and various feedstocks. The syngas produced by the project is fed into a synthesis unit to produce liquid ammonia. In 2022, Hunan Petrochemical conducted its first industrial trial run of biomass co-firing in a pulverized coal gasifier, achieving the target of a 10% biomass mixing ratio. Subsequently, Hunan Petrochemical, together with Sinopec Ningbo Engineering Company and other entities, formed a research team to work continuously on this issue. In 2024, a pilot-scale process package capable of handling 100 tons per batch was developed, and it passed the evaluation by Sinopec’s Science and Technology Department; this provided the necessary conditions for building a flexible pilot platform for the gasification of biomass on an industrial scale.
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Chemical Technology Documentation】Current Research Status on Hydrogen Embrittlement in Hydrogen Transport Pipeline Steels https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716523 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】--How to open and maintain valves that are closely packed together? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716525 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】--How to open and maintain valves that are closely packed together? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716525 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3053–2026: China’s first 100-kilometer-long carbon dioxide transmission pipeline – the million-ton-level CCUS carbon dioxide pipeline in the Shengli Oilfield has been operating smoothly for 1,000 days. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716490 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Which party is responsible for designing the equipment lifting lugs: the design unit, the manufacturing unit, or the construction unit? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716586 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first research project on industrial seawater hydrogen production has successfully completed 1,000 hours of stable operation: 3056-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716642 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3058-2026: Changzhou University makes breakthroughs in ethylene glycol hydrogenation and refining technology; the world’s first upgrade project for converting light hydrocarbons into ethylene glycol is successfully commissioned. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716686 (Source: HaiChuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】3057-2026: International Leadership in Organic Tubular Microporous Membrane and Related Equipment Technologies https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716683 (Source: Haichuan Chemical Industry Forum (HCBBS))