HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The Shuangju Warehouse project at the China Coal Yulin Coal Deep Processing Base has been mechanically completed

2026-04-10View Original

Thread Content

On March 28, the Shuangju Warehouse project of the China Coal Yulin Coal Deep Processing Base, constructed by Zhejiang No.2 Construction Company, was mechanically completed. As the core storage facility of this project, the Shuangju Warehouse features two vertical warehouses made of PP and PE materials, both with identical structural parameters; each warehouse measures 96 meters in length, 90 meters in width, and 37.5 meters in height. Together, they provide over 16,000 standardized storage units, enabling the storage of various types of products. Since its commencement, the project has faced multiple challenges, including high standards for construction, tight deadlines, as well as extreme low temperatures, wind, and snow in the Yulin area during winter. To ensure construction progress and quality, the project team takes measures such as setting up insulation sheds, installing heating equipment, and implementing temperature-controlled curing for concrete, in order to establish a quality assurance system for winter construction. As an intelligent warehousing hub, Shuangju Warehouse is equipped with three core systems: fully automatic packaging and stacking production lines, automated vertical storage systems, and automatic loading systems. It features 11 production lines covering the entire process, 33,280 shelf units, and 1.6 kilometers of loading tracks. The project team, in collaboration with equipment suppliers, formed a specialized installation team of over 200 people. By optimizing work processes and adopting a two-shift operation system, they ensured smooth progression through all stages of the work. Given the high precision requirements for the installation of shelves in automated storage systems, the project team used methods such as laser positioning to conduct repeated checks, ensuring that the installation precision met the design specifications.
Reply #22026-04-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Haicun Chemical Industry Forum (Hcbbs))
Reply #32026-04-13
【Ten Years of Rapid Development in Chemical Equipment】3080–2026: China’s first comprehensive evaluation standard for smart factories – the \"General Guidelines for Evaluating Smart Factories\" (GB/T 46734—2025). **The standard has been officially implemented.** https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717616 (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #42026-04-15
【3D Process Flow】Summary Post--Xinjiang Zhundong’s 33.8-billion-yuan green hydrogen industry chain: the entire process from hydrogen production via wind and solar power to its use in chemical industries https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52026-04-15
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-04-16
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first pilot plant for hydrogen metallurgy using green electricity and green hydrogen was put into operation at Ansteel’s Bayuquan production facility from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717808 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-04-16
【Ten Years of Rapid Development in Chemical Equipment】Successful One-Time Commissioning of Lianyungang’s World’s First Process for Converting Light Hydrocarbons into Ethylene Glycol, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-04-17
【Ten Years of Rapid Development in Chemical Processing Equipment】China National Petroleum’s first megawatt-class PEM hydrogen production system passed the authoritative CNAS testing and certification https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717958 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.