Recently, more good news came in from the site of the Shaanxi Yueneng Fine Chemicals project, which is being constructed by Shaanxi Huajian Lifting Company. After 2 hours and 12 minutes of precise operations, the 347-ton EO reactor feed heat exchanger was successfully lifted into place. This marks the successful completion of a key milestone in the construction of the ethylene oxide plant, laying a solid foundation for the subsequent installation work. It is reported that this lifting operation represents a critical milestone in the construction of the entire ethylene oxide plant. The equipment itself is quite heavy, and it needs to be installed within a steel structural framework, requiring high precision in installation. To carry out the lifting task with precision, the project’s lifting team carefully evaluated various lifting plans; ultimately, it was decided to use a 650-ton crawler crane as the main lifting device, operating in HDB 72-meter boom mode, with a 250-ton crawler crane used for assisting with the lifting process. Once lifting began, the main crane and the auxiliary crane worked together to lift the equipment, turning it from a horizontal position to an upright one. Afterwards, the 250t auxiliary crane released its hook, while the 650t crawler crane rotated clockwise; by lifting and lowering the hook, the equipment was guided through the top of the frame and placed precisely on the foundation. The Yueneng 1 million tons per year high-end chemicals and new materials project is located in the Yushen Industrial Zone, covers an area of 1,500 mu, and has a total estimated investment of 10.315 billion yuan. Once the project is completed and put into operation, it is expected to generate annual revenue of around 8 billion yuan, producing nearly 10 types of chemical products. Shaanxi Huajian Lifting Company was responsible for lifting 63 pieces of large-scale equipment for this project, with a total weight of 10,297.8 tons ; 39 oversized short-haul trucks, with a total weight of 4,686 tons. The lifting and installation of 11 units have been completed so far.
【In-depth Discussion on Modular Installation of HaiChuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3082-2026 to Fill the Gaps. The first-phase project of Zhonghua Chemical West New Materials, with a capacity of 50,000 tons per year for the production of ultra-high molecular weight polyethylene, successfully completed its trial operation upon initial feeding. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717659 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The gas supply for automated instruments is connected to these instruments without being filtered or regulated first. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718231 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose station, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – No Toxic Gas Detectors Installed at the Sampling Points of Formaldehyde Production Units https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718279 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Instruments at the Site Are Difficult to View https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718298 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an international leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Haichuan Chemical History】Summary Post--Viewing Development through History! Constantly being updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The pilot-scale plant for the bio-based furandicarboxylic acid technology developed by Dalian Institute of Chemical Physics was successfully commissioned https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718433 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3094-2026: Filling the Gap! Breakthrough achieved in China’s large-scale production technology for high-end oxalates https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718443 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))