Total investment of 1.649 billion yuan! On April 17, the Xinjiang Uyghur Autonomous Region issued a notice announcing the acceptance status of the environmental impact assessment documents for the first-phase clean and efficient coal utilization technology upgrade project as part of Xinjiang Zhongkun New Materials’ 2×600,000 tons per year ethylene glycol production project.
Project Name: Phase I Technical Transformation Project for Clean and Efficient Utilization of Coal in the 2×600,000 tons/year Natural Gas-to-Ethylene Glycol Project of Zhongkun New Materials. Nature of the project: Technical transformation. Project owner: Xinjiang Zhongkun New Materials Co., Ltd. National economic industry category: C2522 – Production of coal-based syngas. Location: The project is situated within the existing factory complex of Zhongkun Company in the Shangku High-Tech Industrial Development Zone in Korla. The geographical coordinates of the project site are: 85°22'21.307"E, 41°54'20.932"N. The geographical location of the project is shown in Figure 3.2-1, while the satellite imagery and surrounding areas are shown in Figure 3.2-2. Labor quota: The labor quota for this project is 155 people. Working hours: The production management staff for this project work on a single shift system, with 8 hours per shift ; The production department operates on a three-shift, two-shift system, producing 24 hours a day and 8,000 hours per year. Total investment and source of funds: The total investment for this project is 1,648,662,100 yuan, of which 494,598,600 yuan is raised by the enterprise itself, while 1,154,063,500 yuan comes from bank loans. Construction content and scale: The total area of this project is 141,170.8 m2 (211.65 mu). It involves the construction of one synthetic gas production line with an annual output of 14.8×108 m3/year, which includes a gasification unit, a purification unit, as well as various supporting facilities. Upon completion of this project, it will produce 14.8×108 m3 of syngas per year.
【In-depth Discussion on Modular Installation of HaiChuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The gas supply for automated instruments is connected to these instruments without being filtered or regulated first. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718231 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – No Toxic Gas Detectors Installed at the Sampling Points of Formaldehyde Production Units https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718279 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Instruments at the Site Are Difficult to View https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718298 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】3088-2026: China’s first demonstration project for producing high-quality synthetic crude oil using green hydrogen in combination with low-quality heavy oil has been launched. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718140 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an international leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Haichuan Chemical History】Summary Post--Viewing Development Through History! Constantly being updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The pilot-scale plant for the bio-based furan dicarboxylic acid technology developed by Dalian Institute of Chemical Physics was successfully put into operation: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718433 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 3095 to 2026! China’s hydrogen pipeline project secures first order in Europe https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718447 (Source: HCBBS Chemical Forum)