Thread Content
The 25th National \"Safety Production Month\" in 2026: Everyone should talk about safety and know how to handle emergencies; identify and address potential risks and hazards. -------------------------------------------------- On June 18, an invitation for bids was issued for the EPC general contracting of Junrui Green Hydrogen Energy (Shangdu County) Co., Ltd.’s 30,000 tons per year hydrogen production project in Shangdu County. According to the tender announcement, Junrui Green Hydrogen Energy (Shangdu County) Co., Ltd. has been awarded the EPC contract for the 30,000-ton/year hydrogen production project in Shangdu County. The project is located in Bolihujing Township, Shangdu County, Ulanqab City, Inner Mongolia Autonomous Region. The estimated project investment is 1,460.37 million yuan. Project scale: The project covers an area of 375 mu and includes an electrolysis workshop, 2 purification and compression workshops, a power station, a hydrogen tank farm, a control room, etc. The key equipment consists of 84 electrolyzers with a capacity of 1000 Nm³/h, hydrogen storage tanks, as well as hydrogen purification units and compressors ; Auxiliary facilities include power distribution stations, demineralized water treatment systems, circulating cooling water systems, hydrogen delivery systems, air compression nitrogen generation systems, etc., with an equivalent annual operating time of 4,000 hours. Scope of this tender: It includes, but is not limited to, engineering survey, preliminary design (including the project cost estimate), construction drawing design, as-built drawings, construction work, procurement and installation of materials and equipment (except for owner-supplied equipment), commissioning, completion acceptance, filing, handover, rectification of defects during the defect liability period, and warranty services during the quality warranty period. This is a turnkey project. As well as managing and controlling the quality, safety, progress, cost, contracts, information, etc., of engineering projects. Duration: 540 calendar days. Joint bids are accepted for this tender.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 10,000-ton biomass pressurized gasification pilot plant developed by China Energy Engineering Group completed a 72-hour continuous operation test! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723938 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Haichuan Teahouse】Next Stop–Paradise https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723991 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
【Haichuan Chemical History】Summary Post--Viewing Development Through History! Constantly being updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Haichuan Illustrated Guide to Chemical Equipment】-- Liquid Ring Vacuum Pumps https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724058 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
【Safety Management and Standardization of Special Equipment】Illustrated Quick Reference Guide to Major Hazards in Special Equipment! On-site inspections can be carried out through direct comparison, allowing for immediate identification of high-risk hazards. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724082 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
【History of Haichuan Chemical Industry】Chen Jianyuan – Pioneer and master designer in China’s defense chemical industry, fertilizer industry, and new chemical materials https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724090 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
[Haichuan’s Guide to Chemical Engineering Equipment] Auxiliary Systems in Thermal Power Plant Power Stations – Wet Electrostatic Precipitators https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724151 (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Forklifts Without License Plates; It does not comply with the provisions of Article 4.12.2 in the “Rules for the Use and Management of Special Equipment” TSG 08—2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724341 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
[Big Discussion on Modular Installation by Haichuan] The modular construction of the steel structure for Corridor No. 3 of Nantong Blue Ocean New Materials’ FDPE plant achieved one-time transportation, one-time positioning, and one-time success. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723569 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
【Common Issues in Haichuan Pipeline Design】--Why are liquid seals required for some pipelines? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724555 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))