The first bridge truss spanning the road for the entire plant’s external piping system (Bid Section 1) of the first phase of the second phase of Yulin Chemical Project under Shaanxi Coal Group was successfully hoisted into place

2026-05-07View Original

Thread Content

On April 30, the first bridge truss across the road for the external piping system of Phase 1 of the second phase of Yulin Chemical Plant, operated by Shaanxi Coal Group, and which was under the general contracting of China National Chemical Engineering Donghua Company (Bid Section 1), was successfully installed. This marks the entry of the project into its installation peak period, laying a solid foundation for the subsequent connection of process pipelines and the joint testing of equipment. The plant’s external piping system (Phase 1 of Bid Section 1) is a key supporting project for the Phase 1 of the second phase of Yulin Chemical Plant operated by Shaanxi Coal Group. The main construction elements include a pipeline corridor with a total length of about 8 kilometers, as well as the plant’s electrical and telecommunications systems and facilities such as Substation No. 1. This pipeline corridor serves as the core pathway connecting various process units throughout the plant, and it is responsible for transporting key fluids such as oxygen, hydrogen, steam, and water. Upon completion, the project will provide a stable and reliable infrastructure support for the plant’s process production and auxiliary systems. To ensure that the node objectives are achieved on schedule, the project team made advance plans and refined the construction plans. It strictly implemented all aspects of process management, including safety control, technical briefings, and on-site protection, keeping a close eye on the precision of lifting operations and work safety throughout the process, thereby achieving zero hazards, zero deviations, and efficient, seamless completion of the tasks. The successful lifting and installation of the first truss represents another important milestone in the project’s development. Next, the project team will take this as an opportunity to remain committed to its construction goals, strictly oversee safety and quality standards, and accelerate the construction progress. It will carry out all subsequent construction tasks to high standards and with strict requirements, striving to ensure that the project is completed and put into operation as soon as possible.
Reply #22026-05-07
【Haichuan Chemical Valve Management】Series Posts == How to select an electric actuator? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719822 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-05-07
【HaiChuan Chemical Valve Management】Series Posts -- Research on the Design and Application of Extensions for Downhole Gate Valves https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719830 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-05-07
【Haichuan Equipment Guessing Game】Whose place has that huge device installed? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719100 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52026-05-08
【HaiChuan Illustrated Chemical Equipment】 Series Posts – Screw Compressors: How do the male and female rotors crush and compress gases? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719856 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-05-08
【Haichuan Chemical Valve Management】Which valves are most durable for mud, slurry, and dust? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719879 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72026-05-08
【Special Equipment Safety Management and Standardization】Summary Post! Constantly being updated – feel free to communicate! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718553 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-05-09
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Valves Not Regularly Lubricated https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719973 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
Reply #92026-05-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】3115–2026: China’s first fully domesticated control system for a key coal chemical processing unit comes online https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720043 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-05-10
【3D Process Flow】Summary Post--How Is Steel Made? A detailed multi-image guide to the entire process from ore to steel: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720138 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #112026-05-10
【Haichuan Teahouse】Do you like noodles? ? Noodle strips are the last option before starving to death? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720144 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.