HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Public Announcement on the Second Phase of Lanzhou Sanqing Chemical’s New Material Industry Chain Project

2026-05-22View Original

Thread Content

Recently, information regarding the Phase II new material industry chain project (1) of Lanzhou Sanqing Chemical Co., Ltd. was made public on relevant websites. Basic information about the project
Project name: Phase II New Materials Industry Chain Project of Lanzhou Sanqing Chemical Co., Ltd.
(1) Nature of construction: New construction
Construction entity: Lanzhou Sanqing Chemical Co., Ltd.
Construction location: The project is located in the Chemical Industry Park of Lanzhou New Area.
Land area: The total land area is 322,067 m² (approximately 483.1 mu), with a total construction area of 81,684.1 m² ; Project investment: The total investment for the project is 50 million yuan, of which approximately 9 million yuan is allocated to environmental protection measures, accounting for 18% of the total investment. Construction scope: New storage tank areas (Storage Tank Area 4, Storage Tank Area 5, Storage Tank Area 7, Storage Tank Area 8, and yellow phosphorus storage tanks) will be built, along with auxiliary facilities for the production lines and environmental protection systems. Facilities such as Production Workshop 1, Production Workshop 2, Storage Tank Area 1, Storage Tank Area 2, Storage Tank 3, Warehouse Class A 1, Warehouse Class A 2, Warehouse Class C 1, and Warehouse Class C 2 will make use of existing infrastructure.
Reply #22026-05-22
[HaiChuan Safety Forum] Hidden dangers around us – A power distribution room longer than 7 meters has only one emergency exit. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721204 (Source: HaiChuan Chemical Engineering Forum (HaiChuan Flow hcbbs))
Reply #32026-05-22
【Haichuan Small Teahouse】 During the meeting, you were questioned: “Why didn’t you notice it in advance?” ”, How should you, a person with high emotional intelligence, respond? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720574 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #42026-05-22
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-05-23
【Common Issues in Haichuan Pipeline Design】- Complete set of colored illustrations from SH/T3012, the Standard for the Layout and Design of Metal Pipelines in Petrochemical Industries; 01 General requirements for pipeline layout: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721249 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #62026-05-23
[Common issues in pipeline design by Haichuan] – Full version: SH/T3012 Specifications for the layout design of metallic pipelines in petrochemical industries. Hand-drawn color illustrations 07 – Instruments and measuring elements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721270 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #72026-05-24
【Haichuan Chemical Valve Management】Series Posts--What to do if the valve packing is leaking? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721338 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
Reply #82026-05-25
[Haichuan Chemical Valve Management] Series posts – Selection of spiral wound gaskets https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721510 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #92026-05-25
【Safety Management and Standardization of Special Equipment】How to submit inspection applications for skid-mounted equipment? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721540 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-05-25
【In-depth Discussion on HaiChuan’s Modular Installation】Successful shipment of Module No. 1 for the dock tunnel in Indonesia’s CAA-1 caustic soda project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721596 (Source: HaiChuan Chemicals Forum (Hua HaiChuan Liu hcbbs))
Reply #112026-05-26
【Ten Years of Great Development in Chemical Equipment】 The installation of the 4,000-ton components for China’s first fully domestically developed large-scale low-temperature methanol washing unit, designated as 3135-2026, has been successfully completed. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721597 (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.